Back to bathroom remodel contractors
Cahill Contractors Llc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to Aug 2026
- Last 24 months
- 37 permits filed
284 permits since 2000: 201 completed, 38 in progress, 35 never finaled, 10 expired or cancelled.
Of the 35 never-finaled permits, 11 are 3 to 5 years old, 24 are 5 to 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 123 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 400 Geneva Av | art studio/instruction space for youth art exchange, (1) ada bathroom, same size, lighting, electrical, mechanical, f/s. ref arch bpa#202211146434. mechanical, electrical, plumbing. ref bpa#201807033677Details
art studio/instruction space for youth art exchange, (1) ada bathroom, same size, lighting, electrical, mechanical, f/s. ref arch bpa#202211146434. mechanical, electrical, plumbing. ref bpa#201807033677 | $87,250 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 2330 San Jose Av | t.i., office/meeting space for community org, (2) ada bathrooms, lighting, electrical, mecahnical. ref arch bpa#202211146441. mech/elec/plumb. ref bpa#201807033677Details
t.i., office/meeting space for community org, (2) ada bathrooms, lighting, electrical, mecahnical. ref arch bpa#202211146441. mech/elec/plumb. ref bpa#201807033677 | $76,450 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 404 Geneva Av | bike shop, shared bathroom w/402 geneva ave, ref arch bpa#202211146440. mechanical, electrical, plumbing. ref bpa#201807033677Details
bike shop, shared bathroom w/402 geneva ave, ref arch bpa#202211146440. mechanical, electrical, plumbing. ref bpa#201807033677 | $69,750 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 402 Geneva Av | mercantile shop for future t.i., shared bathroom w/404 geneva ave. ref arch bpa#202211146438. mechanical, electrical, plumbing. ref bpa#201807033677Details
mercantile shop for future t.i., shared bathroom w/404 geneva ave. ref arch bpa#202211146438. mechanical, electrical, plumbing. ref bpa#201807033677 | $69,250 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 400 Geneva Av | art studio/instruction space for youth art exchange. first-time t.i. use permit. basebuilding permit 201807033677. (1)a.d.a. bathroom, (1) service sink. lighting, electrical, mechanical to be submitted under separate permit.Details
art studio/instruction space for youth art exchange. first-time t.i. use permit. basebuilding permit 201807033677. (1)a.d.a. bathroom, (1) service sink. lighting, electrical, mechanical to be submitted under separate permit. | $262,840 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 404 Geneva Av | bike shop. first-time t.i. use permit. base building permit 201807033677. (1) service sink. lighting, electrical, mechanical to be submitted under separate permit. bathroom is shared w/neighboring tenant (402 geneva)Details
bike shop. first-time t.i. use permit. base building permit 201807033677. (1) service sink. lighting, electrical, mechanical to be submitted under separate permit. bathroom is shared w/neighboring tenant (402 geneva) | $178,290 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 2330 San Jose Av | office/meeting space for community organization. first t.i. permit for commercial space of ground floor affordable housing project bpa#201807033677. (2)a.d.a. bathrooms. lighting, electrical, mechanical to be submitted under separate permitDetails
office/meeting space for community organization. first t.i. permit for commercial space of ground floor affordable housing project bpa#201807033677. (2)a.d.a. bathrooms. lighting, electrical, mechanical to be submitted under separate permit | $623,200 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 402 Geneva Av | mercantile shop for future tenant. first-time t.i. use permit. base building permit 201807033677. (1)new shared a.d.a. bathroom with 404 geneva, (1) service sink. lighting, electrical, mechanical to be submitted under separate permit.Details
mercantile shop for future tenant. first-time t.i. use permit. base building permit 201807033677. (1)new shared a.d.a. bathroom with 404 geneva, (1) service sink. lighting, electrical, mechanical to be submitted under separate permit. | $232,790 |
| Jan 10, 2022 | Completed final sign-off Apr 2023 | 681 Florida St | rev to pa201802211851-s2: male/female bathrooms in pdr 1 are changed to wall gender bathrooms. water closets in all gender bathroom in the residentail common area are rotated due to large wall-hung carriers. level 9: laundry room layout changed due to bim coordination and new washer/dryer appliance.Details
rev to pa201802211851-s2: male/female bathrooms in pdr 1 are changed to wall gender bathrooms. water closets in all gender bathroom in the residentail common area are rotated due to large wall-hung carriers. level 9: laundry room layout changed due to bim coordination and new washer/dryer appliance. | |
| Sep 27, 2017 | Completed final sign-off Aug 2022 | 136 Lunado Wy | horizontal addition to existing residence at ground, add 1 bath and 1 bed. and second level- 1 bedroom only. conversion of existing basement for additional living space.Details
horizontal addition to existing residence at ground, add 1 bath and 1 bed. and second level- 1 bedroom only. conversion of existing basement for additional living space. | $150,000 |
| Oct 19, 2015 | Completed final sign-off Oct 2019 | 838 Pacific Av | horizontal addition. co gen enclosure. renov unit-kitchen/baths-new appl&plumbing fixtures.g/fl-offices,community rm,laundry.new interior main entrances on pacific ave.replac all windows in kind,new entry drs.landscaping along pacific ave.Details
horizontal addition. co gen enclosure. renov unit-kitchen/baths-new appl&plumbing fixtures.g/fl-offices,community rm,laundry.new interior main entrances on pacific ave.replac all windows in kind,new entry drs.landscaping along pacific ave. | $18,000,000 |