Cahill Contractors Llc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to Aug 2026
- Last 24 months
- 37 permits filed
284 permits since 2000: 201 completed, 38 in progress, 35 never finaled, 10 expired or cancelled.
Of the 35 never-finaled permits, 11 are 3 to 5 years old, 24 are 5 to 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 2 in progress. Typically 0 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | In progress issued Jun 2026 | 1111 Gough St | drilling through diaphram of plaza/cross baseplate to install a sculpture. there will be no modification to the structure of the cathedral bldg & plaza other than the sculpture's attachment to concrete deck. sculpture will be anchored on the (e) plaza of the st. mary's cathedral at gough & geary.Details
drilling through diaphram of plaza/cross baseplate to install a sculpture. there will be no modification to the structure of the cathedral bldg & plaza other than the sculpture's attachment to concrete deck. sculpture will be anchored on the (e) plaza of the st. mary's cathedral at gough & geary. | $2,000 |
| Dec 10, 2025 | In progress issued Dec 2025 | 1111 Gough St | cahill plans to anchor sculpture on the existing exterior plaza of st. mary's cathedral church at gough and geary streets. sculpture will attach to deck via anchor bolts through existing concrete waffle slab.Details
cahill plans to anchor sculpture on the existing exterior plaza of st. mary's cathedral church at gough and geary streets. sculpture will attach to deck via anchor bolts through existing concrete waffle slab. | $50,000 |
| Apr 17, 2018 | Completed final sign-off Jun 2018 | 350 Friedell St | removal of stucco, installation of new sheet metal flashing, reinstall stucco, reinstall (e) guardrails and paint. comply with s-10 on deck drainage. all work is being performed on exterior balconies above ground floor garage entry. total of (5) decks. maher n/aDetails
removal of stucco, installation of new sheet metal flashing, reinstall stucco, reinstall (e) guardrails and paint. comply with s-10 on deck drainage. all work is being performed on exterior balconies above ground floor garage entry. total of (5) decks. maher n/a | $100,000 |