Back to kitchen remodel contractors
Cabrillo Construction Co. Inc.
- Based in
- Millbrae
- On San Francisco permits
- Nov 2004 to Mar 2026
- Last 24 months
- 2 permits filed
48 permits since 2000: 38 completed, 4 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 36 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2020 | Completed final sign-off Mar 2022 | 593 Jersey St | remove interior wall at rear bedroom on 2nd floor & incorporate into 9e) dining room. rebuild (e) stair from 2nd floor to 3rd. replace (e) fireplace fire box with gas insert in family room. replace kitchen cabinet, counter, & appliance. replace 4 (e) doors w/ packet door.Details
remove interior wall at rear bedroom on 2nd floor & incorporate into 9e) dining room. rebuild (e) stair from 2nd floor to 3rd. replace (e) fireplace fire box with gas insert in family room. replace kitchen cabinet, counter, & appliance. replace 4 (e) doors w/ packet door. | $50,000 |
| Dec 10, 2020 | Expired or cancelled withdrawn Oct 2022 | 3242 Taraval St | 3242: new electrical,bath & kitchen remodel,new bedroom, new washer/dryer. 3246:new electrical, new bedroo, new washer/dryer.3254: new electrical, bathroom & kitchen remodel, new bedroom, new washer/dryer.Details
3242: new electrical,bath & kitchen remodel,new bedroom, new washer/dryer. 3246:new electrical, new bedroo, new washer/dryer.3254: new electrical, bathroom & kitchen remodel, new bedroom, new washer/dryer. | $65,000 |
| Feb 19, 2019 | Completed final sign-off Feb 2020 | 891 28th Av | provide new ewsidential unit on 1st floor including kitchen, bathroom, bedroom. remodel kitchen & bathroom and add a bathroom at unit #1 on 2nd flrDetails
provide new ewsidential unit on 1st floor including kitchen, bathroom, bedroom. remodel kitchen & bathroom and add a bathroom at unit #1 on 2nd flr | $95,000 |
| Feb 12, 2016 | Completed final sign-off Aug 2016 | 519 Hickory St | kitchen remodeling including replacing of cabinet & countertop & appliances. remodel (e) master bedroom w/new master bath. install new skylight above (n) master bath. add more lightings.Details
kitchen remodeling including replacing of cabinet & countertop & appliances. remodel (e) master bedroom w/new master bath. install new skylight above (n) master bath. add more lightings. | $15,000 |
| Jul 6, 2009 | Completed final sign-off Apr 2010 | 587 Jersey St | convert (e) basement into 1 bedrm and 1 bath. covert (e) attic space into master bedrm and master bathrm. install one new dormer. alteration of (e) 2nd fl. relocate kitchen, bathrm zsfamily rmDetails
convert (e) basement into 1 bedrm and 1 bath. covert (e) attic space into master bedrm and master bathrm. install one new dormer. alteration of (e) 2nd fl. relocate kitchen, bathrm zsfamily rm | $150,000 |