Back to bathroom remodel contractors
Cabrillo Construction Co. Inc.
- Based in
- Millbrae
- On San Francisco permits
- Nov 2004 to Mar 2026
- Last 24 months
- 2 permits filed
48 permits since 2000: 38 completed, 4 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 1 in progress, 1 expired or cancelled. Typically 28 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2025 | In progress filed Jun 2025, not yet issued | 2813 Bush St | revision to pa #201801309887. reconfigure existing 3rd floor master bathroom. (reduce size). replace in kind window with existing bathroom location of closet and new full bathroom will be flipped. no fireplace within master bedroom.Details
revision to pa #201801309887. reconfigure existing 3rd floor master bathroom. (reduce size). replace in kind window with existing bathroom location of closet and new full bathroom will be flipped. no fireplace within master bedroom. | $20,000 |
| Jan 31, 2022 | Completed final sign-off Apr 2022 | 151 Galewood Cr | replace the tub with a walk in shower 30 inch x 60 inch. replace the inward swing door with pocket door inhalf bathroom on third floor.Details
replace the tub with a walk in shower 30 inch x 60 inch. replace the inward swing door with pocket door inhalf bathroom on third floor. | $3,000 |
| Dec 10, 2020 | Expired or cancelled withdrawn Oct 2022 | 3242 Taraval St | 3242: new electrical,bath & kitchen remodel,new bedroom, new washer/dryer. 3246:new electrical, new bedroo, new washer/dryer.3254: new electrical, bathroom & kitchen remodel, new bedroom, new washer/dryer.Details
3242: new electrical,bath & kitchen remodel,new bedroom, new washer/dryer. 3246:new electrical, new bedroo, new washer/dryer.3254: new electrical, bathroom & kitchen remodel, new bedroom, new washer/dryer. | $65,000 |
| Aug 22, 2020 | Completed final sign-off Dec 2024 | 480 Andover St | adding a new 3rd floor on an exisitng 2-story bldg. exterior renovation on the facade of the bldg. new grand room at the 1st flr w/ a new wet bar and full bathroom. the new added 3rd flr will be furnished w/ one master suite and 2 bedrooms.Details
adding a new 3rd floor on an exisitng 2-story bldg. exterior renovation on the facade of the bldg. new grand room at the 1st flr w/ a new wet bar and full bathroom. the new added 3rd flr will be furnished w/ one master suite and 2 bedrooms. | $250,000 |
| Feb 19, 2019 | Completed final sign-off Feb 2020 | 891 28th Av | provide new ewsidential unit on 1st floor including kitchen, bathroom, bedroom. remodel kitchen & bathroom and add a bathroom at unit #1 on 2nd flrDetails
provide new ewsidential unit on 1st floor including kitchen, bathroom, bedroom. remodel kitchen & bathroom and add a bathroom at unit #1 on 2nd flr | $95,000 |
| Jan 23, 2017 | Completed final sign-off Jun 2017 | 577 39th Av | convert one bathroom to two full bathroom at 2/f, enclosure (e) light well at 2/fDetails
convert one bathroom to two full bathroom at 2/f, enclosure (e) light well at 2/f | $28,000 |
| Nov 4, 2016 | Completed final sign-off Jun 2017 | 577 39th Av | legalize two bedroom, media room, laundry room & one full bathroom at ground floor.Details
legalize two bedroom, media room, laundry room & one full bathroom at ground floor. | $40,000 |
| Feb 12, 2016 | Completed final sign-off Aug 2016 | 519 Hickory St | kitchen remodeling including replacing of cabinet & countertop & appliances. remodel (e) master bedroom w/new master bath. install new skylight above (n) master bath. add more lightings.Details
kitchen remodeling including replacing of cabinet & countertop & appliances. remodel (e) master bedroom w/new master bath. install new skylight above (n) master bath. add more lightings. | $15,000 |
| Jul 6, 2009 | Completed final sign-off Apr 2010 | 587 Jersey St | convert (e) basement into 1 bedrm and 1 bath. covert (e) attic space into master bedrm and master bathrm. install one new dormer. alteration of (e) 2nd fl. relocate kitchen, bathrm zsfamily rmDetails
convert (e) basement into 1 bedrm and 1 bath. covert (e) attic space into master bedrm and master bathrm. install one new dormer. alteration of (e) 2nd fl. relocate kitchen, bathrm zsfamily rm | $150,000 |
| Mar 12, 2009 | Completed final sign-off Apr 2009 | 895 Hayes St | minor revision to appl #200703075692-s1 change interior layout including revision to stair & bathroom, eliminate two windows at rear right side & new skylight. no change in ext. no structural change.Details
minor revision to appl #200703075692-s1 change interior layout including revision to stair & bathroom, eliminate two windows at rear right side & new skylight. no change in ext. no structural change. |