Back to kitchen remodel contractors
C.M. Peletz Company
- Based in
- San Jose
- On San Francisco permits
- Jun 2000 to Oct 2017
- Last 24 months
- 0 permits filed
27 permits since 2000: 20 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 expired or cancelled. Typically 168 days from filing to permit and 256 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2017 | Completed final sign-off Nov 2017 | 1333 Jones St | #317: kitchen and bathroom remodel including; new wood flooring, plumbing fixtures, lighting fixtures, painting and tiles at shower walls and floor. installation of subpanel to accomodate arc fault gfi and dedicated circuits in bathroo and mini ref./micr. location. maher n/aDetails
#317: kitchen and bathroom remodel including; new wood flooring, plumbing fixtures, lighting fixtures, painting and tiles at shower walls and floor. installation of subpanel to accomodate arc fault gfi and dedicated circuits in bathroo and mini ref./micr. location. maher n/a | $20,000 |
| Oct 19, 2006 | Completed final sign-off Nov 2008 | 1420 Montgomery St | new storage space @ existing crawl space with elevator access to basement.1/f-demo storage/mechanical space and construct (n) apartment #1,relocate from level 3. 2/f-remodel kitchen/baths & lobby. 3/f-remove existing apartment 3 to 1/f and convert to bedrooms for apartment 4. 4/f-remodel living areaDetails
new storage space @ existing crawl space with elevator access to basement.1/f-demo storage/mechanical space and construct (n) apartment #1,relocate from level 3. 2/f-remodel kitchen/baths & lobby. 3/f-remove existing apartment 3 to 1/f and convert to bedrooms for apartment 4. 4/f-remodel living area | $900,000 |
| Oct 2, 2002 | Expired or cancelled expired May 2004 | 501 Marina Bl | remodel bathrooms, kitchen & interior finishes. interior work only.Details
remodel bathrooms, kitchen & interior finishes. interior work only. | $75,000 |
| Apr 24, 2002 | Expired or cancelled expired Aug 2005 | 1499 Masonic Av | new addition to the rear of the building, new deck at 1st level and second level. remodel of kitchenDetails
new addition to the rear of the building, new deck at 1st level and second level. remodel of kitchen | $250,000 |