Back to bathroom remodel contractors
C.M. Peletz Company
- Based in
- San Jose
- On San Francisco permits
- Jun 2000 to Oct 2017
- Last 24 months
- 0 permits filed
27 permits since 2000: 20 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 3 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 362 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2017 | Never finaled issued Oct 2017, no final | 1333 Jones St | #1404 - revision to pa #201710050457: proposed wall relocation of a non-load bearing wall in master bath closet. n/a maher ordinanceDetails
#1404 - revision to pa #201710050457: proposed wall relocation of a non-load bearing wall in master bath closet. n/a maher ordinance | $2,500 |
| Oct 5, 2017 | Completed final sign-off Oct 2018 | 1333 Jones St | unit #1404 - master bath & guest bath remodel incl. (n) cabinetry, conuntertop, plumbing fixtures, ligting, tiles at shower & tub, & painting. no walls moved, no walls demo'd. n/a for maher.Details
unit #1404 - master bath & guest bath remodel incl. (n) cabinetry, conuntertop, plumbing fixtures, ligting, tiles at shower & tub, & painting. no walls moved, no walls demo'd. n/a for maher. | $80,000 |
| Aug 15, 2017 | Completed final sign-off Nov 2017 | 1333 Jones St | #317: kitchen and bathroom remodel including; new wood flooring, plumbing fixtures, lighting fixtures, painting and tiles at shower walls and floor. installation of subpanel to accomodate arc fault gfi and dedicated circuits in bathroo and mini ref./micr. location. maher n/aDetails
#317: kitchen and bathroom remodel including; new wood flooring, plumbing fixtures, lighting fixtures, painting and tiles at shower walls and floor. installation of subpanel to accomodate arc fault gfi and dedicated circuits in bathroo and mini ref./micr. location. maher n/a | $20,000 |
| Aug 15, 2017 | Expired or cancelled cancelled Jan 2026 | 1333 Jones St | unit #317: cosmetic updating to existing unit including new wood flooring, plumbing fixtures, lighting fixtures, painting, and tile at shower walls and floors. installation of subpanel to accomodate arcfault gfi and dedicated circuits in bathroom and mini-ref/microwave location. maher naDetails
unit #317: cosmetic updating to existing unit including new wood flooring, plumbing fixtures, lighting fixtures, painting, and tile at shower walls and floors. installation of subpanel to accomodate arcfault gfi and dedicated circuits in bathroom and mini-ref/microwave location. maher na | $20,000 |
| Mar 22, 2011 | Never finaled issued Mar 2011, no final | 757 Market St | unit #ph2d:bathroom to be removed, lights relocated, drywall finished, new carpet, paint, door relocated.Details
unit #ph2d:bathroom to be removed, lights relocated, drywall finished, new carpet, paint, door relocated. | $3,000 |
| Oct 19, 2006 | Completed final sign-off Nov 2008 | 1420 Montgomery St | new storage space @ existing crawl space with elevator access to basement.1/f-demo storage/mechanical space and construct (n) apartment #1,relocate from level 3. 2/f-remodel kitchen/baths & lobby. 3/f-remove existing apartment 3 to 1/f and convert to bedrooms for apartment 4. 4/f-remodel living areaDetails
new storage space @ existing crawl space with elevator access to basement.1/f-demo storage/mechanical space and construct (n) apartment #1,relocate from level 3. 2/f-remodel kitchen/baths & lobby. 3/f-remove existing apartment 3 to 1/f and convert to bedrooms for apartment 4. 4/f-remodel living area | $900,000 |
| Oct 2, 2002 | Expired or cancelled expired May 2004 | 501 Marina Bl | remodel bathrooms, kitchen & interior finishes. interior work only.Details
remodel bathrooms, kitchen & interior finishes. interior work only. | $75,000 |