Back to kitchen remodel contractors
C.L. Construction Co.
- Based in
- Daly City
- On San Francisco permits
- Nov 2002 to Jul 2020
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2020 | Completed final sign-off Jul 2021 | 1909 Anza St | remodel kitchen (approx 12'x13'): replace new cabinet, new countertop, new sink, faucet, add (6) new recessed light fixture in kitchen, hallway and bedroom. top floor: remodel 2 bathrooms(master bath: 13'x10'. other: 10'x5'6"): new shower base, tub, new plumbing fixtures. all work in kind.Details
remodel kitchen (approx 12'x13'): replace new cabinet, new countertop, new sink, faucet, add (6) new recessed light fixture in kitchen, hallway and bedroom. top floor: remodel 2 bathrooms(master bath: 13'x10'. other: 10'x5'6"): new shower base, tub, new plumbing fixtures. all work in kind. | $51,000 |
| Aug 25, 2016 | Completed final sign-off Jul 2017 | 1431 27th Av | remodel 1st fl to add 2 bedrooms, 2 full baths, remodel kitchen and bath on 2nd fl, relocate furnace, water heater, laundryDetails
remodel 1st fl to add 2 bedrooms, 2 full baths, remodel kitchen and bath on 2nd fl, relocate furnace, water heater, laundry | $48,000 |
| Feb 2, 2015 | Completed final sign-off Oct 2015 | 2058 47th Av | install new 2 bedrooms & 1 bathroom @ 1st floor. remodel existing bathroom & kitchen @ 2nd floor.Details
install new 2 bedrooms & 1 bathroom @ 1st floor. remodel existing bathroom & kitchen @ 2nd floor. | $55,000 |
| Dec 24, 2013 | Completed final sign-off Oct 2014 | 1300 Ortega St | remodeling (e) kitchen @ 1/f and 2/f; change (e) bathroom fixtures @ 1/f and 2/f; provide sound proof bd @ bedroom @ 1/fDetails
remodeling (e) kitchen @ 1/f and 2/f; change (e) bathroom fixtures @ 1/f and 2/f; provide sound proof bd @ bedroom @ 1/f | $35,000 |
| May 31, 2007 | Completed final sign-off Aug 2007 | 2218 Quintara St | ground floor remodel, adding a study room, bedroom, full bath, and laundry area. remodel kitchen and bath on 2nd floor. replace 4 windows on 2nd floor ( 2 at front/2 at rear)Details
ground floor remodel, adding a study room, bedroom, full bath, and laundry area. remodel kitchen and bath on 2nd floor. replace 4 windows on 2nd floor ( 2 at front/2 at rear) | $35,000 |
| Aug 1, 2006 | Completed final sign-off Feb 2007 | 2615 37th Av | change kitchen cabinets , lighting, power for dish washer, gfci rec. painting and wall repair. insulation in studs. no structural changesDetails
change kitchen cabinets , lighting, power for dish washer, gfci rec. painting and wall repair. insulation in studs. no structural changes | $20,000 |