Back to bathroom remodel contractors
C.L. Construction Co.
- Based in
- Daly City
- On San Francisco permits
- Nov 2002 to Jul 2020
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 12 completed, 1 never finaled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2020 | Completed final sign-off Jul 2021 | 1909 Anza St | remodel kitchen (approx 12'x13'): replace new cabinet, new countertop, new sink, faucet, add (6) new recessed light fixture in kitchen, hallway and bedroom. top floor: remodel 2 bathrooms(master bath: 13'x10'. other: 10'x5'6"): new shower base, tub, new plumbing fixtures. all work in kind.Details
remodel kitchen (approx 12'x13'): replace new cabinet, new countertop, new sink, faucet, add (6) new recessed light fixture in kitchen, hallway and bedroom. top floor: remodel 2 bathrooms(master bath: 13'x10'. other: 10'x5'6"): new shower base, tub, new plumbing fixtures. all work in kind. | $51,000 |
| Aug 25, 2016 | Completed final sign-off Jul 2017 | 1431 27th Av | remodel 1st fl to add 2 bedrooms, 2 full baths, remodel kitchen and bath on 2nd fl, relocate furnace, water heater, laundryDetails
remodel 1st fl to add 2 bedrooms, 2 full baths, remodel kitchen and bath on 2nd fl, relocate furnace, water heater, laundry | $48,000 |
| Feb 2, 2015 | Completed final sign-off Oct 2015 | 2058 47th Av | install new 2 bedrooms & 1 bathroom @ 1st floor. remodel existing bathroom & kitchen @ 2nd floor.Details
install new 2 bedrooms & 1 bathroom @ 1st floor. remodel existing bathroom & kitchen @ 2nd floor. | $55,000 |
| Dec 24, 2013 | Completed final sign-off Oct 2014 | 1300 Ortega St | remodeling (e) kitchen @ 1/f and 2/f; change (e) bathroom fixtures @ 1/f and 2/f; provide sound proof bd @ bedroom @ 1/fDetails
remodeling (e) kitchen @ 1/f and 2/f; change (e) bathroom fixtures @ 1/f and 2/f; provide sound proof bd @ bedroom @ 1/f | $35,000 |
| Aug 31, 2012 | Completed final sign-off Dec 2012 | 216 04th Av | unit#10: proposed remodel (e) bathrooms; add 1-(n) full bathroom; extend the (e) hallway area to the apartment & add 1-(n) family room for unit 10 only. sprinklers under separate permit.Details
unit#10: proposed remodel (e) bathrooms; add 1-(n) full bathroom; extend the (e) hallway area to the apartment & add 1-(n) family room for unit 10 only. sprinklers under separate permit. | $20,000 |
| Apr 24, 2012 | Completed final sign-off Jul 2012 | 2550 35th Av | 2nd floor: add a bathroom. 1st floor: install 2 bedroom, bathroom and storage room.Details
2nd floor: add a bathroom. 1st floor: install 2 bedroom, bathroom and storage room. | $28,000 |
| Jun 5, 2008 | Completed final sign-off Sep 2008 | 731 Newhall St | adding two bedroom, one full bathroom, a family room & a laundry area on ground fl.Details
adding two bedroom, one full bathroom, a family room & a laundry area on ground fl. | $25,000 |
| Jun 5, 2008 | Completed final sign-off Oct 2008 | 1686 32nd Av | ground floor remodel: add one storage & one full bathroom. no structure change. no work on 2nd floor - ref dwg. #9212930.Details
ground floor remodel: add one storage & one full bathroom. no structure change. no work on 2nd floor - ref dwg. #9212930. | $10,000 |
| May 15, 2008 | Never finaled issued May 2008, no final | 263 Bridgeview Dr | revision to pa# 2008/03/29/8093 to relocate approved bathroom and create new closet on the ground floor.Details
revision to pa# 2008/03/29/8093 to relocate approved bathroom and create new closet on the ground floor. | |
| Mar 27, 2008 | Completed final sign-off Jul 2008 | 263 Bridgeview Dr | enclose space for (n) bedroom on the 1st fl. under the existing sunroom. add new bedroom, bathroom and laundry on the 1st floor. remodel existing bathroom on 2nd floor.Details
enclose space for (n) bedroom on the 1st fl. under the existing sunroom. add new bedroom, bathroom and laundry on the 1st floor. remodel existing bathroom on 2nd floor. | $32,000 |
| May 31, 2007 | Completed final sign-off Aug 2007 | 2218 Quintara St | ground floor remodel, adding a study room, bedroom, full bath, and laundry area. remodel kitchen and bath on 2nd floor. replace 4 windows on 2nd floor ( 2 at front/2 at rear)Details
ground floor remodel, adding a study room, bedroom, full bath, and laundry area. remodel kitchen and bath on 2nd floor. replace 4 windows on 2nd floor ( 2 at front/2 at rear) | $35,000 |
| May 1, 2007 | Completed final sign-off Aug 2007 | 3721 Ulloa St | remodel ground floor to add 2 bedrooms, relocation of a bathroom and add a stairway on second floor to the rear yardDetails
remodel ground floor to add 2 bedrooms, relocation of a bathroom and add a stairway on second floor to the rear yard | $35,000 |
| Nov 15, 2002 | Completed final sign-off Feb 2003 | 218 Beverly St | ground floor improvement adding 2 bedrooms, a full bathroom and a storage area.Details
ground floor improvement adding 2 bedrooms, a full bathroom and a storage area. | $15,000 |