C & K Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Apr 2011
- Last 24 months
- 0 permits filed
13 permits since 2000: 12 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 1 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2010 | Completed final sign-off Nov 2010 | 445 Teresita Bl | remove existing front window (alum. frame) 12'x5'-6". also one side window 4'x5'-6" at stair. no enlargement of existing openings. remove (e) windows with new wood clad windows. replace front face siding with stucco to match bottom of garage. max. u-factor for windows is 0.4Details
remove existing front window (alum. frame) 12'x5'-6". also one side window 4'x5'-6" at stair. no enlargement of existing openings. remove (e) windows with new wood clad windows. replace front face siding with stucco to match bottom of garage. max. u-factor for windows is 0.4 | $5,000 |
| Feb 4, 2010 | Completed final sign-off Jul 2010 | 2465 Washington St | remodel e 2d floor kitchen and bedroom into 1 large kitchen. remodel e bath and e bedroom into n master bedroom, remodel e 3rd fl bedroom into 2 new baths, repair e front entry stair trendsDetails
remodel e 2d floor kitchen and bedroom into 1 large kitchen. remodel e bath and e bedroom into n master bedroom, remodel e 3rd fl bedroom into 2 new baths, repair e front entry stair trends | $80,000 |
| May 13, 2008 | Completed final sign-off Aug 2008 | 544 Chenery St | replace (e) concrete stairs in kind. less than 50% of stairway repair.Details
replace (e) concrete stairs in kind. less than 50% of stairway repair. | $3,000 |