Back to bathroom remodel contractors
C & K Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Apr 2011
- Last 24 months
- 0 permits filed
13 permits since 2000: 12 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2010 | Completed final sign-off Jan 2011 | 84 Dorland St | remove (e) bathroom tile on walls and floor. remove tub & replace with (n) shower. sink to remain. provide high efficancy lights or "manual on" occupancy sensor.Details
remove (e) bathroom tile on walls and floor. remove tub & replace with (n) shower. sink to remain. provide high efficancy lights or "manual on" occupancy sensor. | $8,000 |
| Feb 4, 2010 | Completed final sign-off Jul 2010 | 2465 Washington St | remodel e 2d floor kitchen and bedroom into 1 large kitchen. remodel e bath and e bedroom into n master bedroom, remodel e 3rd fl bedroom into 2 new baths, repair e front entry stair trendsDetails
remodel e 2d floor kitchen and bedroom into 1 large kitchen. remodel e bath and e bedroom into n master bedroom, remodel e 3rd fl bedroom into 2 new baths, repair e front entry stair trends | $80,000 |
| Oct 27, 2009 | Completed final sign-off Dec 2009 | 62 Florentine Av | replace existing bathroom on 1st fl. in kind. new tub, tiles, vanity and toilet replace (e) proch door. with new, approx. size 6x8 ft.Details
replace existing bathroom on 1st fl. in kind. new tub, tiles, vanity and toilet replace (e) proch door. with new, approx. size 6x8 ft. | $9,037 |
| Aug 25, 2008 | Completed final sign-off Nov 2008 | 340 Dorantes Av | remove (e) stucco of front face over garage level approx 20' x 30'. replace 10 sets of windows with wood clad due to rot. remodel (e) bedroom & bathroom in aupairs room. bath add 5 x 8. new shower sink & wc. 10 windows to be replace with aluminum wood clad as same light division pattern as existing.Details
remove (e) stucco of front face over garage level approx 20' x 30'. replace 10 sets of windows with wood clad due to rot. remodel (e) bedroom & bathroom in aupairs room. bath add 5 x 8. new shower sink & wc. 10 windows to be replace with aluminum wood clad as same light division pattern as existing. | $30,000 |
| Jul 14, 2008 | Completed final sign-off Sep 2008 | 158 Middlefield Dr | replace existing bathroom on 1st fl, remove existing fixtures & tile and replace with new.Details
replace existing bathroom on 1st fl, remove existing fixtures & tile and replace with new. | $6,500 |