C G Engineering And Const Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to May 2012
- Last 24 months
- 0 permits filed
44 permits since 2000: 40 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 7 days from filing to permit and 46 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2011 | Completed final sign-off Aug 2011 | 35 Wilder St | repair dry rot staircase inculding, repair damage wood framing in kind, no structural work involoved. repair work is less than 50%Details
repair dry rot staircase inculding, repair damage wood framing in kind, no structural work involoved. repair work is less than 50% | $4,800 |
| Jun 24, 2011 | Completed final sign-off Sep 2011 | 2236 23rd St | replace wood siding @ front of building @ garage entry. install code complaint stair handrail & landing guardrail at buildbing entrance stairs.Details
replace wood siding @ front of building @ garage entry. install code complaint stair handrail & landing guardrail at buildbing entrance stairs. | $23,000 |
| Jun 14, 2011 | Completed final sign-off Jun 2012 | 3317 Washington St | addition of living space behind garage in basement. new stairs to access main floor, move side stairs back at breezeway to provide more light to new living spaceDetails
addition of living space behind garage in basement. new stairs to access main floor, move side stairs back at breezeway to provide more light to new living space | $130,000 |
| Jun 9, 2011 | Completed final sign-off Jun 2011 | 908 Kansas St | repair stairs in kind, paint (less than 50% repair)Details
repair stairs in kind, paint (less than 50% repair) | $1,200 |
| Feb 23, 2011 | Completed final sign-off Apr 2011 | 14 Mint Pz | to comply w/nov#201188228 - add wheel guide rails between handrail post at wheelchair ramp. apply vrethane to darken concrete steps & polish stainless steel stripes to create contrast (visual) at stair striping.Details
to comply w/nov#201188228 - add wheel guide rails between handrail post at wheelchair ramp. apply vrethane to darken concrete steps & polish stainless steel stripes to create contrast (visual) at stair striping. | $1,500 |
| Dec 29, 2010 | Completed final sign-off Jan 2012 | 2044 Divisadero St | create new living space at ground floor as part of 2nd floor unit. new stair connecting to the unit. post in garage to be removedDetails
create new living space at ground floor as part of 2nd floor unit. new stair connecting to the unit. post in garage to be removed | $30,000 |