Back to kitchen remodel contractors
C G Engineering And Const Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to May 2012
- Last 24 months
- 0 permits filed
44 permits since 2000: 40 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 4 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2011 | Completed final sign-off Aug 2014 | 258 Laussat St | remodel of (e) kitchen & remove wall @ first floor, enclose 3rd. story deck to create bay window at front of building.Details
remodel of (e) kitchen & remove wall @ first floor, enclose 3rd. story deck to create bay window at front of building. | $20,000 |
| Aug 12, 2011 | Completed final sign-off Jan 2012 | 2044 Divisadero St | comply with condo conversion report# cc-5542, legalize kitchen & bathroom remodel.Details
comply with condo conversion report# cc-5542, legalize kitchen & bathroom remodel. | $19,000 |
| Jun 17, 2011 | Completed final sign-off Mar 2012 | 1609 Polk St | comply with complaint #201143421, legalize work for type i kitchen exhaust hood replacement (mech. only).Details
comply with complaint #201143421, legalize work for type i kitchen exhaust hood replacement (mech. only). | $8,000 |
| Dec 27, 2010 | Completed final sign-off Apr 2011 | 4285 26th St | kitchen and bath remodel. in kind. lighting to comply with cec 150 k. no change to wall windows and doorsDetails
kitchen and bath remodel. in kind. lighting to comply with cec 150 k. no change to wall windows and doors | $14,000 |
| Dec 3, 2010 | Completed final sign-off Feb 2011 | 355 Buena Vista East Av | replace kitchen cabinets, counters, replace tile in bathroom and plumbing fixturesDetails
replace kitchen cabinets, counters, replace tile in bathroom and plumbing fixtures | $5,000 |
| Nov 30, 2010 | Completed final sign-off Sep 2011 | 2236 23rd St | to comply with nov 201051134, dated june 10, 2010. fire damaged repair & interior kitchen and bathroom fixture replacement. replace windows at front in-kind. upgrade electrical wiring and outlets to cec 2010.Details
to comply with nov 201051134, dated june 10, 2010. fire damaged repair & interior kitchen and bathroom fixture replacement. replace windows at front in-kind. upgrade electrical wiring and outlets to cec 2010. | $200,000 |
| Jul 29, 2010 | Completed final sign-off Oct 2010 | 435 Ralston St | remodel kitchen at 2nd fl. legalize ground fl family/office and remodel bathroom. install sliding glass door 6' x 80" at existing window opening ground floor . pa# 2010.01.07.4362 for referenceDetails
remodel kitchen at 2nd fl. legalize ground fl family/office and remodel bathroom. install sliding glass door 6' x 80" at existing window opening ground floor . pa# 2010.01.07.4362 for reference | $30,000 |