Back to bathroom remodel contractors
C G Adams Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Oct 2021
- Last 24 months
- 0 permits filed
138 permits since 2000: 106 completed, 14 never finaled, 18 expired or cancelled.
Of the 14 never-finaled permits, 8 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
54 bathroom remodel permits: 44 completed, 4 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2020 | Completed final sign-off May 2022 | 372 Cresta Vista Dr | revision to app#201906042438. in 1st floor: delete new bathroom, delete one new sliding door. change heating system to be radiant heating.Details
revision to app#201906042438. in 1st floor: delete new bathroom, delete one new sliding door. change heating system to be radiant heating. | |
| Jul 12, 2019 | Never finaled issued Jul 2019, no final | 2050 29th Av | revision to app#201606160110 remove bathroom on 1st floor. convert to storage which will eliminate the following: work provide 20 min door 5/8 sheet rock under stair provide 5/8 sheetrock and r-19 insulation on garage ceiling. remove all elect. in storage area.Details
revision to app#201606160110 remove bathroom on 1st floor. convert to storage which will eliminate the following: work provide 20 min door 5/8 sheet rock under stair provide 5/8 sheetrock and r-19 insulation on garage ceiling. remove all elect. in storage area. | |
| Jul 1, 2019 | Never finaled issued Jul 2019, no final | 1121 Clay St | unit # 3: remodle kitchen and bathroom in kind. no structural work.Details
unit # 3: remodle kitchen and bathroom in kind. no structural work. | $60,000 |
| Mar 12, 2019 | Completed final sign-off Nov 2019 | 48 Coventry Ct | remodle in kind, upper floor kitchen 16'x16' and bathroom 5'x10'.Details
remodle in kind, upper floor kitchen 16'x16' and bathroom 5'x10'. | $51,000 |
| Mar 7, 2019 | Completed final sign-off Nov 2019 | 48 Coventry Ct | interior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heaterDetails
interior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heater | $200,000 |
| Feb 4, 2019 | Completed final sign-off Oct 2019 | 1255 42nd Av | interior remodel with bearing wall removal. bathroom remodel in kindDetails
interior remodel with bearing wall removal. bathroom remodel in kind | $35,000 |
| Oct 26, 2018 | Completed final sign-off Jun 2020 | 482 Douglass St | remodel 2/f including replace/relocate kitchen, bathrm, bedrm, living rm. new stairs to 1/f. 1/f: 2 new bedrms, 1-1/2 baths, and associated storage/closet. no work at 3rd fl except (n) fahu. new radiant heating at 1/f & 2/f.Details
remodel 2/f including replace/relocate kitchen, bathrm, bedrm, living rm. new stairs to 1/f. 1/f: 2 new bedrms, 1-1/2 baths, and associated storage/closet. no work at 3rd fl except (n) fahu. new radiant heating at 1/f & 2/f. | $285,000 |
| Aug 7, 2018 | Expired or cancelled cancelled Mar 2019 | 482 Douglass St | kitchen adn bathroom remodel, add new full bathroom on 2nd fl. all work on 2nd fl.Details
kitchen adn bathroom remodel, add new full bathroom on 2nd fl. all work on 2nd fl. | $75,000 |
| Feb 26, 2018 | Completed final sign-off Oct 2018 | 1200 California St | interior remodel to extg dwelling unit. add new powder room, reconfigure extg closets, and bathroom remodel in kind. no structural work. n/a for maherDetails
interior remodel to extg dwelling unit. add new powder room, reconfigure extg closets, and bathroom remodel in kind. no structural work. n/a for maher | $40,000 |
| Mar 8, 2017 | Completed final sign-off Jun 2017 | 55 Diamond St | remodel 2 bathrooms in kind & same locationDetails
remodel 2 bathrooms in kind & same location | $20,000 |
| Aug 19, 2016 | Completed final sign-off Dec 2016 | 473 Bryant St | remove plumbing work done w/o permit at front space, renovate (e) bath at back space to ada standards, add ada ramp & signage, add kitchen cabinets, sink & dishwasher to break room area, work exclusive in pa#201604154946, space to remain vacant. n/a ordinance #155-13Details
remove plumbing work done w/o permit at front space, renovate (e) bath at back space to ada standards, add ada ramp & signage, add kitchen cabinets, sink & dishwasher to break room area, work exclusive in pa#201604154946, space to remain vacant. n/a ordinance #155-13 | $20,000 |
| Jun 16, 2016 | Never finaled issued Aug 2018, no final | 2050 29th Av | 1)add 2 storage, closet and one bathroom on 1st floor per plan. clear complaint planning 2016.010925enfDetails
1)add 2 storage, closet and one bathroom on 1st floor per plan. clear complaint planning 2016.010925enf | $20,000 |
| Nov 4, 2015 | Completed final sign-off Oct 2016 | 1255 42nd Av | renovation of top floor with new wall in kids bedroom, new master closet and bathroom, renovated shared bathroom and new skylights.Details
renovation of top floor with new wall in kids bedroom, new master closet and bathroom, renovated shared bathroom and new skylights. | $50,000 |
| Oct 29, 2015 | Completed final sign-off Oct 2016 | 1255 42nd Av | remodel 2 bathrooms in-kind. no change in walls & openings. high efficiency lightin or controlled by manual on sensors with high-efficency main light.Details
remodel 2 bathrooms in-kind. no change in walls & openings. high efficiency lightin or controlled by manual on sensors with high-efficency main light. | $22,000 |
| Oct 29, 2015 | Completed final sign-off Dec 2015 | 1200 California St | bathroom remodel in-kind in maid's quarter unit mr9 on 16/f. noDetails
bathroom remodel in-kind in maid's quarter unit mr9 on 16/f. no | $12,000 |
| Aug 6, 2015 | Completed final sign-off Apr 2016 | 1200 California St | within 1 apartment only - #16c + mr9 - remodel 3 bath rooms, 1 powder room & kitchen in kind. no structural wall. to comply with cec150.0(k)3 & 5Details
within 1 apartment only - #16c + mr9 - remodel 3 bath rooms, 1 powder room & kitchen in kind. no structural wall. to comply with cec150.0(k)3 & 5 | $75,000 |
| Jul 15, 2015 | Completed final sign-off Nov 2015 | 3788 16th St | dry rot repair in a master bath and exterior wall, 40 sq ft(not visible from street)Details
dry rot repair in a master bath and exterior wall, 40 sq ft(not visible from street) | $2,000 |
| Jul 7, 2015 | Completed final sign-off Nov 2015 | 3788 16th St | remodel in kind, two (2) bathrooms.Details
remodel in kind, two (2) bathrooms. | $20,000 |
| Feb 18, 2015 | Completed final sign-off Jun 2015 | 1997 Eddy St | bathroom remodel in kind. no walls moved, removed or added. all existing layout to remain unchanged.Details
bathroom remodel in kind. no walls moved, removed or added. all existing layout to remain unchanged. | $10,000 |
| Jan 23, 2015 | Completed final sign-off Apr 2015 | 633 Masonic Av | remodel one kitchen and one bathroom in-kind at the lower unit, no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5.Details
remodel one kitchen and one bathroom in-kind at the lower unit, no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5. | $20,000 |
| Oct 14, 2014 | Completed final sign-off Feb 2015 | 355 Buena Vista East Av | unit #513: kitchen and bath remodel in kind. no change to doors or windows. work for this unit only.Details
unit #513: kitchen and bath remodel in kind. no change to doors or windows. work for this unit only. | $18,000 |
| Sep 22, 2014 | Expired or cancelled expired Jul 2018 | 427 Kirkham St | proposed 3rd story addition to provide 2 new children bedrooms and shared bathroom plus new master suite with bathroom and walk in closet. ground floor to be converted to habitable space with guest room and utility room.Details
proposed 3rd story addition to provide 2 new children bedrooms and shared bathroom plus new master suite with bathroom and walk in closet. ground floor to be converted to habitable space with guest room and utility room. | $120,000 |
| Jun 26, 2014 | Expired or cancelled expired Jan 2018 | 715 Florida St | new 2 stories 434 sq. ft. addition @ front of (e) house. new stucco facade @ entire addition. 2 new bedrooms & 2 new bathrooms.Details
new 2 stories 434 sq. ft. addition @ front of (e) house. new stucco facade @ entire addition. 2 new bedrooms & 2 new bathrooms. | $75,000 |
| Jun 13, 2014 | Never finaled issued Jun 2014, no final | 2044 Green St | install new hood over existing range in 2/f kitchen, remodel 2 3rd floor bathrooms, new duct enclosure @ 3/f deck & install new windows @ 2nd & 3rd floors @ east side, enclose new flue @ (e) deck @ rear of bldg., (n) windows not visable from street. n/a ordinance #155-13Details
install new hood over existing range in 2/f kitchen, remodel 2 3rd floor bathrooms, new duct enclosure @ 3/f deck & install new windows @ 2nd & 3rd floors @ east side, enclose new flue @ (e) deck @ rear of bldg., (n) windows not visable from street. n/a ordinance #155-13 | $35,000 |
| May 13, 2014 | Completed final sign-off Oct 2014 | 1150 Sacramento St | remove (e) cabinets in kitchen, remove vanity in master bath & guest bath, install (n) cabinets in kitchen, install (n) vanities in master & guest bathrooms.Details
remove (e) cabinets in kitchen, remove vanity in master bath & guest bath, install (n) cabinets in kitchen, install (n) vanities in master & guest bathrooms. | $30,000 |
| Mar 3, 2014 | Expired or cancelled expired Jun 2015 | 1121 Clay St | remodel kitchen & bath in kind. new kitchen cabinets in kind. no structural changes. no change in walls & opening layout. kitchen lighting shall have min 50% high efficacy & bathroom lighting high efficacy or controlled by manuel on sensor.Details
remodel kitchen & bath in kind. new kitchen cabinets in kind. no structural changes. no change in walls & opening layout. kitchen lighting shall have min 50% high efficacy & bathroom lighting high efficacy or controlled by manuel on sensor. | $150,000 |
| Jan 17, 2014 | Expired or cancelled expired Apr 2016 | 69 Prosper St | revision to app#201311071411. remove new bathroom from scope and enlarg new bathroom next to stairs.Details
revision to app#201311071411. remove new bathroom from scope and enlarg new bathroom next to stairs. | |
| Nov 7, 2013 | Expired or cancelled expired Apr 2016 | 69 Prosper St | remodel of top unit condo. relocate kitchen and bathroom. new master bathroom. structural upgrades per plan. no exterior work.Details
remodel of top unit condo. relocate kitchen and bathroom. new master bathroom. structural upgrades per plan. no exterior work. | $50,000 |
| May 20, 2013 | Completed final sign-off Oct 2013 | 488 Gold Mine Dr | remodel bathroom on 1st floor. remove non load bearing partitions, fixtures and finishes. new partitions, fixutres and finishes. reuse extg lighting, electrical and mechanical as is.Details
remodel bathroom on 1st floor. remove non load bearing partitions, fixtures and finishes. new partitions, fixutres and finishes. reuse extg lighting, electrical and mechanical as is. | $5,000 |
| May 13, 2013 | Completed final sign-off Oct 2013 | 488 Gold Mine Dr | remodel kitchen and bath in kind, replace hood in kinds , kitchen ligghts to comply with 50% high efficacy. bath lighting high efficacyDetails
remodel kitchen and bath in kind, replace hood in kinds , kitchen ligghts to comply with 50% high efficacy. bath lighting high efficacy | $20,000 |
| Mar 21, 2013 | Completed final sign-off Nov 2013 | 1704 Vallejo St | remodel 2 baths in kind - vanity, tile, plumbing & electricalDetails
remodel 2 baths in kind - vanity, tile, plumbing & electrical | $12,000 |
| Dec 5, 2012 | Completed final sign-off Jun 2013 | 769 18th Av | to comply with nov 201272422 - remove illegal unit. remove kitchen & bath and change to storage. add 1/2 bathDetails
to comply with nov 201272422 - remove illegal unit. remove kitchen & bath and change to storage. add 1/2 bath | $2,500 |
| Oct 31, 2012 | Completed final sign-off Feb 2013 | 1998 Broadway | remodel kitchen & 2 baths in kind. existing bathroom exhaust fans to remain. kitchen lighting shall comply with cec150(k)8, bathroom lighting shall comply with cec 150(k)10.Details
remodel kitchen & 2 baths in kind. existing bathroom exhaust fans to remain. kitchen lighting shall comply with cec150(k)8, bathroom lighting shall comply with cec 150(k)10. | $30,000 |
| Sep 4, 2012 | Completed final sign-off Jul 2013 | 1170 Sacramento St | patch (e) harwood flr. install (n) cabinets in kitchen & bath, (n) light & (n) plumbing fixtures in master bath, guest bath & powder rm. open drywall to accomodate plumbing & electrical work, no structural work, light must comply with cec 150150(k).Details
patch (e) harwood flr. install (n) cabinets in kitchen & bath, (n) light & (n) plumbing fixtures in master bath, guest bath & powder rm. open drywall to accomodate plumbing & electrical work, no structural work, light must comply with cec 150150(k). | $95,000 |
| Oct 25, 2011 | Completed final sign-off Mar 2012 | 448 43rd Av | infill under existing overhang of upper level to create new bathroom, office,master bedroomDetails
infill under existing overhang of upper level to create new bathroom, office,master bedroom | $75,000 |
| Mar 28, 2011 | Completed final sign-off Aug 2011 | 1560 48th Av | replace 10 alum. windows in front with marvin wood, rear new vinyl window 17 ea. 4 patio door, max u factor 0.40, remodel 3/f bathroom in kind, remove stucco on face of bldg, repair dryrot as needed. replace stucco in kind.Details
replace 10 alum. windows in front with marvin wood, rear new vinyl window 17 ea. 4 patio door, max u factor 0.40, remodel 3/f bathroom in kind, remove stucco on face of bldg, repair dryrot as needed. replace stucco in kind. | $45,000 |
| Oct 22, 2010 | Completed final sign-off Mar 2011 | 676 Clarendon Av | retile 2 bathroom, install new lighting, new vanity in 2 baths on 3/f. no structural changes.Details
retile 2 bathroom, install new lighting, new vanity in 2 baths on 3/f. no structural changes. | $25,000 |
| Sep 8, 2010 | Completed final sign-off Apr 2011 | 3790 Fillmore St | proposed remodel of existing building. storage, kitchen, nook, dining, living rm, master bedroom, bath, and bedroom 2 and 3. update all windows. add full bath at 3rd fl.Details
proposed remodel of existing building. storage, kitchen, nook, dining, living rm, master bedroom, bath, and bedroom 2 and 3. update all windows. add full bath at 3rd fl. | $148,000 |
| Feb 22, 2010 | Completed final sign-off May 2010 | 1708 Vallejo St | install new bath, tile, vanity, new shower valve. no structural work, replace in-kind.Details
install new bath, tile, vanity, new shower valve. no structural work, replace in-kind. | $19,900 |
| Feb 11, 2010 | Completed final sign-off Mar 2010 | 652 Parnassus Av | revision to 201002015633. remove wall between toilet and bath. install walls for closetDetails
revision to 201002015633. remove wall between toilet and bath. install walls for closet | |
| Feb 1, 2010 | Completed final sign-off Mar 2010 | 652 Parnassus Av | install new plumbing fixtures and tile in master bath room on first floor unitDetails
install new plumbing fixtures and tile in master bath room on first floor unit | $28,000 |
| Nov 13, 2009 | Completed final sign-off Feb 2010 | 1708 Vallejo St | remodel bathroom - new tile, fixtures, plumbing, new shower valve - new vanity cabinet - exhaust fan, upgrade elec for title 24 ( high efficency lights or o.s.) no structural work. replace in kind. no window work & no door work on this permit.Details
remodel bathroom - new tile, fixtures, plumbing, new shower valve - new vanity cabinet - exhaust fan, upgrade elec for title 24 ( high efficency lights or o.s.) no structural work. replace in kind. no window work & no door work on this permit. | $19,700 |
| Oct 8, 2009 | Completed final sign-off Dec 2009 | 1 Daniel Burnham Ct | install new kitchen cabinets, counter tops and appliances. install new bathroom fixtures and tie (vanity, toilet and sink)Details
install new kitchen cabinets, counter tops and appliances. install new bathroom fixtures and tie (vanity, toilet and sink) | $38,000 |
| Aug 12, 2009 | Completed final sign-off Oct 2009 | 20 Cerritos Av | install new tile, plumbing, electrical, install gfi circuit on 2nd floor west bathroom. no structural changes.Details
install new tile, plumbing, electrical, install gfi circuit on 2nd floor west bathroom. no structural changes. | $9,000 |
| Jul 17, 2009 | Completed final sign-off Jul 2009 | 2329 North Point St | revisionn to pa# 2009.06.17.0632. remove illegal half bathroom at ground floor and convert it to new storage roomDetails
revisionn to pa# 2009.06.17.0632. remove illegal half bathroom at ground floor and convert it to new storage room | |
| Jun 19, 2009 | Completed final sign-off Oct 2009 | 20 Cerritos Av | installed new tile, new plumbing fixtures, install gfi circuits in 2 bathrooms for 2nd floor, no structural changesDetails
installed new tile, new plumbing fixtures, install gfi circuits in 2 bathrooms for 2nd floor, no structural changes | $9,000 |
| Jun 17, 2009 | Completed final sign-off Jul 2009 | 2329 North Point St | legalize (e) storage rm and install half bath on ground floorDetails
legalize (e) storage rm and install half bath on ground floor | $5,000 |
| May 12, 2009 | Completed final sign-off Jun 2009 | 4207 26th St | proposed remodeling (e) bathroom & closet. provided new skylight above bathroom at 2nd floorDetails
proposed remodeling (e) bathroom & closet. provided new skylight above bathroom at 2nd floor | $20,000 |
| Apr 23, 2009 | Completed final sign-off Jul 2009 | 2329 North Point St | 3r report#cc5517. mitigate required separation between garage & upper units. remove undocumented rooms(s) bathroom on ground floor.Details
3r report#cc5517. mitigate required separation between garage & upper units. remove undocumented rooms(s) bathroom on ground floor. | $9,000 |
| Feb 13, 2009 | Completed final sign-off Jun 2009 | 236 Moncada Wy | remodel 2 existing bathrooms, enlarge bathroom @ 2nd floor.Details
remodel 2 existing bathrooms, enlarge bathroom @ 2nd floor. | $30,000 |
| Jul 22, 2008 | Completed final sign-off Nov 2008 | 2801 Jackson St | work @ unit# 11 only. remodel existing bathroom. new fixtures, tile, update electrical. no structural work. new lighting to be high efficiency or manual on auto off switch.Details
work @ unit# 11 only. remodel existing bathroom. new fixtures, tile, update electrical. no structural work. new lighting to be high efficiency or manual on auto off switch. | $14,500 |
| Jul 7, 2008 | Completed final sign-off Oct 2008 | 2147 25th Av | remodel existing 1 bath st floor. new door at bathroom. install new cabinets existing 1 kitchen. no changes existing structure. no change to window.Details
remodel existing 1 bath st floor. new door at bathroom. install new cabinets existing 1 kitchen. no changes existing structure. no change to window. | $35,000 |
| Mar 25, 2008 | Completed final sign-off Sep 2008 | 1122 Clay St | remodel (e) kitchen and two baths. remodel only no changes to existing structure (e) exhaust fan to remained in bathroom.Details
remodel (e) kitchen and two baths. remodel only no changes to existing structure (e) exhaust fan to remained in bathroom. | $35,000 |
| Feb 22, 2001 | Completed final sign-off Oct 2001 | 9 Marietta Dr | lower level reconfigure partitions, add master bedroom & bath (n) glass room/office and workshop, adDetails
lower level reconfigure partitions, add master bedroom & bath (n) glass room/office and workshop, ad |