Back to kitchen remodel contractors
Building Repair Co.
- Based in
- San Francisco,
- On San Francisco permits
- Jan 2000 to Feb 2018
- Last 24 months
- 0 permits filed
31 permits since 2000: 27 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2014 | Completed final sign-off Oct 2014 | 120 Wetmore St | remodel two (e) bathroom and one (e) kitchen. replace in kind, no structural work.Details
remodel two (e) bathroom and one (e) kitchen. replace in kind, no structural work. | $40,000 |
| Sep 4, 2013 | Completed final sign-off Jan 2014 | 620 Presidio Av | unit #3: remodel existing kitchen and bathroom on the 2nd flr, light to comply with cec 150(k)Details
unit #3: remodel existing kitchen and bathroom on the 2nd flr, light to comply with cec 150(k) | $15,000 |
| Oct 5, 2011 | Completed final sign-off May 2012 | 508 Sweeny St | 1) add office room, playroom, family room,laundry and 2 full bath on ground floor. convert extg family room to bed room at ground. 2)convert extg bath to 2 bath and extg kitchen to 2 bedrooms and rearrange rooms at 2nd floor, & (2)new bathrms on 2nd fl. 3) add guest room under exg 2nd floor sun roomDetails
1) add office room, playroom, family room,laundry and 2 full bath on ground floor. convert extg family room to bed room at ground. 2)convert extg bath to 2 bath and extg kitchen to 2 bedrooms and rearrange rooms at 2nd floor, & (2)new bathrms on 2nd fl. 3) add guest room under exg 2nd floor sun room | $50,000 |
| Dec 1, 2008 | Completed final sign-off Jan 2009 | 101 Brentwood Av | new electrical panel & wiring. kitchen remodel (cabinet & counter tops).Details
new electrical panel & wiring. kitchen remodel (cabinet & counter tops). | $25,000 |
| Jun 23, 2008 | Completed final sign-off Jun 2009 | 3008 Clay St | one unit -- 3008a clay street: pull out (1) kitchen cabinets, pull out 2 bathtubs in master, pull out 1 kitchen flooring; same kitchen no change walls, windows or doorsDetails
one unit -- 3008a clay street: pull out (1) kitchen cabinets, pull out 2 bathtubs in master, pull out 1 kitchen flooring; same kitchen no change walls, windows or doors | $21,000 |
| Sep 24, 2007 | Completed final sign-off May 2009 | 647 18th Av | add exercise room. half bath & storage at g/f. rearrange rooms & kitchen per plan. add 2 bathroom at 3/f, enlarge (e) garage door from 7' to 10' remove some post & beams on ground & replace with new overhead beam.Details
add exercise room. half bath & storage at g/f. rearrange rooms & kitchen per plan. add 2 bathroom at 3/f, enlarge (e) garage door from 7' to 10' remove some post & beams on ground & replace with new overhead beam. | $40,000 |
| Jul 19, 2007 | Completed final sign-off Oct 2007 | 3551 Noriega St | 1 kitchen remodel. change electrical panel, install sheetrock @ garage area. no enclosing of rooms.Details
1 kitchen remodel. change electrical panel, install sheetrock @ garage area. no enclosing of rooms. | $13,000 |