Back to bathroom remodel contractors
Building Repair Co.
- Based in
- San Francisco,
- On San Francisco permits
- Jan 2000 to Feb 2018
- Last 24 months
- 0 permits filed
31 permits since 2000: 27 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 2 never finaled. Typically 6 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2018 | Completed final sign-off May 2018 | 240 Lobos St | convert ground floor space to family room, game room, gym and 2 half baths; add 1 new bath @ 2nd floorDetails
convert ground floor space to family room, game room, gym and 2 half baths; add 1 new bath @ 2nd floor | $158,094 |
| May 25, 2016 | Completed final sign-off Aug 2017 | 614 45th Av | add ground floor living space including bathroom, family room & 2 bedrooms. add bathroom on 2nd floor. new furnace & water heater & laundry in garage. in-fill light well for internal stair between levels.Details
add ground floor living space including bathroom, family room & 2 bedrooms. add bathroom on 2nd floor. new furnace & water heater & laundry in garage. in-fill light well for internal stair between levels. | $40,000 |
| Mar 18, 2015 | Never finaled issued Mar 2015, no final | 658 03rd Av | 1) revision to ongoing construction permit #200711198515. 2) 2nd floor: eliminate 1 full bath, reconfigurate 1 full bath and add 1/2 bath. 3) third floor: no change. 4) 4th fl. add 2 bedrooms, 1 full bathroom & 30" cabinet wet bar.Details
1) revision to ongoing construction permit #200711198515. 2) 2nd floor: eliminate 1 full bath, reconfigurate 1 full bath and add 1/2 bath. 3) third floor: no change. 4) 4th fl. add 2 bedrooms, 1 full bathroom & 30" cabinet wet bar. | $50,000 |
| Jul 2, 2014 | Completed final sign-off Oct 2014 | 120 Wetmore St | remodel two (e) bathroom and one (e) kitchen. replace in kind, no structural work.Details
remodel two (e) bathroom and one (e) kitchen. replace in kind, no structural work. | $40,000 |
| Sep 4, 2013 | Completed final sign-off Jan 2014 | 620 Presidio Av | unit #3: remodel existing kitchen and bathroom on the 2nd flr, light to comply with cec 150(k)Details
unit #3: remodel existing kitchen and bathroom on the 2nd flr, light to comply with cec 150(k) | $15,000 |
| Oct 5, 2011 | Completed final sign-off May 2012 | 508 Sweeny St | 1) add office room, playroom, family room,laundry and 2 full bath on ground floor. convert extg family room to bed room at ground. 2)convert extg bath to 2 bath and extg kitchen to 2 bedrooms and rearrange rooms at 2nd floor, & (2)new bathrms on 2nd fl. 3) add guest room under exg 2nd floor sun roomDetails
1) add office room, playroom, family room,laundry and 2 full bath on ground floor. convert extg family room to bed room at ground. 2)convert extg bath to 2 bath and extg kitchen to 2 bedrooms and rearrange rooms at 2nd floor, & (2)new bathrms on 2nd fl. 3) add guest room under exg 2nd floor sun room | $50,000 |
| May 31, 2011 | Completed final sign-off Jan 2012 | 2824 Filbert St | to obtain final inspection & complete work for work approved under pa#201003319386. original scope relocate maser bath, bedroom & stair on 3/f.Details
to obtain final inspection & complete work for work approved under pa#201003319386. original scope relocate maser bath, bedroom & stair on 3/f. | $1,500 |
| Mar 31, 2010 | Completed final sign-off Jan 2012 | 2824 Filbert St | revision to pa# 2007.11.13.8015 to field conditions. relocate master bath, stair case, relocate bath and bedrooms on 3rd fl. add three property line windows.Details
revision to pa# 2007.11.13.8015 to field conditions. relocate master bath, stair case, relocate bath and bedrooms on 3rd fl. add three property line windows. | $5,000 |
| Sep 28, 2009 | Completed final sign-off Feb 2010 | 3429 Judah St | convert (e) bathroom into 2 bathrooms at 2nd fl. add 2 full bathrooms , guest room & exersice room @ ground fl. replace (e) window by door and enlarge (e) window & closed (e) door @ ground floor. add four (n) windows at ground floor. not visble from street.Details
convert (e) bathroom into 2 bathrooms at 2nd fl. add 2 full bathrooms , guest room & exersice room @ ground fl. replace (e) window by door and enlarge (e) window & closed (e) door @ ground floor. add four (n) windows at ground floor. not visble from street. | $50,000 |
| Jul 27, 2009 | Completed final sign-off Jul 2010 | 1635 43rd Av | 1-story horizontal addition at rear yard. add family rm. & roof deck. convert (e) playroom to bedroom & hall. rearrange (e) ground floor bathroom.Details
1-story horizontal addition at rear yard. add family rm. & roof deck. convert (e) playroom to bedroom & hall. rearrange (e) ground floor bathroom. | $30,000 |
| Sep 27, 2007 | Completed final sign-off Sep 2008 | 1933 California St | #1933- provide family room, bedroom & bath at 1/f. provide internal stair between 1/f & 2/f, remodel baths at 2/f.Details
#1933- provide family room, bedroom & bath at 1/f. provide internal stair between 1/f & 2/f, remodel baths at 2/f. | $45,000 |
| Sep 24, 2007 | Completed final sign-off May 2009 | 647 18th Av | add exercise room. half bath & storage at g/f. rearrange rooms & kitchen per plan. add 2 bathroom at 3/f, enlarge (e) garage door from 7' to 10' remove some post & beams on ground & replace with new overhead beam.Details
add exercise room. half bath & storage at g/f. rearrange rooms & kitchen per plan. add 2 bathroom at 3/f, enlarge (e) garage door from 7' to 10' remove some post & beams on ground & replace with new overhead beam. | $40,000 |
| Aug 23, 2007 | Completed final sign-off Jan 2009 | 54 Idora Av | renovate (e) convert (e) unused space into (n) livign space, add 2 bays to rear to match (e), upgrade plumbing & electrical. work includ. demo of struct & non struct. walls, add (n) bathrooms & bedrooms, excavation of lowest level to create 8' head ht. relocate/add windows.Details
renovate (e) convert (e) unused space into (n) livign space, add 2 bays to rear to match (e), upgrade plumbing & electrical. work includ. demo of struct & non struct. walls, add (n) bathrooms & bedrooms, excavation of lowest level to create 8' head ht. relocate/add windows. | $90,000 |
| Oct 25, 2006 | Completed final sign-off Jun 2007 | 2014 10th Av | construct new master bedroom, family room, bathroom and enclose light court on the ground level for walk-in closet.Details
construct new master bedroom, family room, bathroom and enclose light court on the ground level for walk-in closet. | $25,000 |
| Jun 23, 2006 | Never finaled issued Jan 2007, no final | 1283 33rd Av | enlarge (e) sun room for guest room, sitting room, breakfast, home office and add 2 bathrooms. add (n) deck & stairs.add (n) deck & stair.Details
enlarge (e) sun room for guest room, sitting room, breakfast, home office and add 2 bathrooms. add (n) deck & stairs.add (n) deck & stair. | $60,000 |
| Dec 12, 2005 | Completed final sign-off Jan 2008 | 85 Burlwood Dr | vertical addition, add 3 bedroom, 2 bath & family room on 3rd floor per plan.Details
vertical addition, add 3 bedroom, 2 bath & family room on 3rd floor per plan. | $150,000 |
| Jan 31, 2000 | Completed final sign-off Jan 2001 | 362 Munich St | legalize ground floor rooms & baths-remove stove,sink,cabinets & bathtubDetails
legalize ground floor rooms & baths-remove stove,sink,cabinets & bathtub | $3,500 |