Building Lab
- Based in
- Oakland
- On San Francisco permits
- Feb 2009 to May 2026
- Last 24 months
- 2 permits filed
32 permits since 2000: 28 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 815 days from filing to permit and 313 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2011 | Completed final sign-off Jan 2015 | 2835 Larkin St | enclose existing roof deck (approx 80 sq ft). reconfigure existing bathroom at upper level floor and add 1/2 bath.Details
enclose existing roof deck (approx 80 sq ft). reconfigure existing bathroom at upper level floor and add 1/2 bath. | $50,000 |