Building Lab
- Based in
- Oakland
- On San Francisco permits
- Feb 2009 to May 2026
- Last 24 months
- 2 permits filed
32 permits since 2000: 28 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 never finaled. Typically 20 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2022 | Completed final sign-off Jan 2024 | 10 El Sereno Ct | interior remodel including kitchen and 3 bathrooms; new powder room, new windows at arear & east elevations; no addition or change to buildng footprintDetails
interior remodel including kitchen and 3 bathrooms; new powder room, new windows at arear & east elevations; no addition or change to buildng footprint | $150,000 |
| Jan 7, 2021 | Never finaled issued Apr 2021, no final | 31 El Sereno Ct | remodel 3rd fl. c onvert non-habitable space, add 1 bed/ 1 bath/ family room at 2nd fl, and add play room/ 1 bath at 1st floor. add, replace windows & skylights. less than 50% repair to rear deck.Details
remodel 3rd fl. c onvert non-habitable space, add 1 bed/ 1 bath/ family room at 2nd fl, and add play room/ 1 bath at 1st floor. add, replace windows & skylights. less than 50% repair to rear deck. | $160,000 |
| Dec 31, 2019 | Completed final sign-off Sep 2024 | 1701 15th Av | remodel top floors.kitchen remodel, baths eliminate front patio at 3rd fl. keep e decks and install new guard rails, residing entire houseDetails
remodel top floors.kitchen remodel, baths eliminate front patio at 3rd fl. keep e decks and install new guard rails, residing entire house | $150,000 |
| Aug 22, 2019 | Completed final sign-off Jul 2020 | 619 29th St | master bath remodel include: removing a window, replacing 3 windows (2- 45 minute rated) & replacing doors. replace 2 skylights. per plansDetails
master bath remodel include: removing a window, replacing 3 windows (2- 45 minute rated) & replacing doors. replace 2 skylights. per plans | $30,000 |
| Mar 2, 2018 | Completed final sign-off Jun 2020 | 15 El Sereno Ct | addition for m.bath/closet & remodel hall bath @ 2nd flr. addition into (e) lightwell to enlarge (e) powder rm @ 1st flr.Details
addition for m.bath/closet & remodel hall bath @ 2nd flr. addition into (e) lightwell to enlarge (e) powder rm @ 1st flr. | $120,000 |
| Oct 22, 2014 | Completed final sign-off Jun 2015 | 55 Murray St | an interior remodle of a basement for (n) concrete slab & conversion of rear half into habitable space includ family, mud, full bath, study room. replacement of (e) staircase. exterior work at backyard for a new built in patio.Details
an interior remodle of a basement for (n) concrete slab & conversion of rear half into habitable space includ family, mud, full bath, study room. replacement of (e) staircase. exterior work at backyard for a new built in patio. | $250,000 |
| Feb 3, 2014 | Completed final sign-off May 2014 | 2409 Scott St | #5- enlarge master bathroom, add powder room to hallway @ lower level. remodel guest bathroom & enlarge shower @ upper level.Details
#5- enlarge master bathroom, add powder room to hallway @ lower level. remodel guest bathroom & enlarge shower @ upper level. | $45,000 |
| Dec 31, 2013 | Completed final sign-off May 2014 | 4150 17th St | #1. remodeling kitchen and bathroom to include new lighting, electrical. no structural work.Details
#1. remodeling kitchen and bathroom to include new lighting, electrical. no structural work. | $70,000 |
| Dec 31, 2013 | Completed final sign-off May 2014 | 284 Gold Mine Dr | remodeling a bathroom, entry and study room. to include new lighting, electrical, relocating plumbing fittings. no structural work.Details
remodeling a bathroom, entry and study room. to include new lighting, electrical, relocating plumbing fittings. no structural work. | $40,000 |
| Feb 1, 2013 | Completed final sign-off May 2013 | 262 Rutledge St | reference to appn. 201102049681; finish installing fixtures; bathroom remodel, all rough plumbing inspection done in last permit; moving some electrical work & doing finishing workDetails
reference to appn. 201102049681; finish installing fixtures; bathroom remodel, all rough plumbing inspection done in last permit; moving some electrical work & doing finishing work | $45,000 |
| May 25, 2012 | Completed final sign-off Aug 2012 | 1273 Mcallister St | kitchen renovation, replace bathroom fixtures (one and 1/2 bath), patch wall. repaint. add lighting fixture.Details
kitchen renovation, replace bathroom fixtures (one and 1/2 bath), patch wall. repaint. add lighting fixture. | $40,000 |
| Dec 28, 2011 | Completed final sign-off Aug 2012 | 130 22nd Av | kitchen renovation at 2nd floor-demo (e) kitchen & powder room, re-configure master bedroom, add 1 bathroom to make master suite at 3rd floor & add skylight. locate new laundry room at ground floor. replace awning at rearDetails
kitchen renovation at 2nd floor-demo (e) kitchen & powder room, re-configure master bedroom, add 1 bathroom to make master suite at 3rd floor & add skylight. locate new laundry room at ground floor. replace awning at rear | $100,000 |
| Dec 5, 2011 | Completed final sign-off Jan 2015 | 2835 Larkin St | enclose existing roof deck (approx 80 sq ft). reconfigure existing bathroom at upper level floor and add 1/2 bath.Details
enclose existing roof deck (approx 80 sq ft). reconfigure existing bathroom at upper level floor and add 1/2 bath. | $50,000 |
| Nov 1, 2010 | Completed final sign-off Oct 2011 | 140 Clarendon Av | add 1 bedroom + 1 bath room @ existing crawl space below garage. add 1 door & a windows to (e) facade, detailing + finishes to match existing.Details
add 1 bedroom + 1 bath room @ existing crawl space below garage. add 1 door & a windows to (e) facade, detailing + finishes to match existing. | $100,000 |