Back to kitchen remodel contractors
Building Construction Express
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Sep 2026
- Last 24 months
- 13 permits filed
41 permits since 2000: 27 completed, 6 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 14 completed, 1 in progress, 3 never finaled. Typically 18 days from filing to permit and 275 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Jun 2026 | 149 Talbert St | upgrade electrical service to 200 amp, relocate furnace & laundry. add a bedroom, a media room, a gym room, a bathroom & kitchenette on 1st floor. no structural alterations.Details
upgrade electrical service to 200 amp, relocate furnace & laundry. add a bedroom, a media room, a gym room, a bathroom & kitchenette on 1st floor. no structural alterations. | $60,000 |
| Nov 3, 2025 | Completed final sign-off Mar 2026 | 2150 Ulloa St | kitchen remodel in kind. remove and replace existing cabinets and sheetrock. rewire and add lights and switches in kitchen. add waterline for refrigerator. replace floor tiles.Details
kitchen remodel in kind. remove and replace existing cabinets and sheetrock. rewire and add lights and switches in kitchen. add waterline for refrigerator. replace floor tiles. | $30,000 |
| Sep 8, 2025 | Completed final sign-off Aug 2026 | 117 Vasquez Av | remodel kitchen & dining room for open concept at 2/f. propose four new skylights. two new windows on east exterior wallDetails
remodel kitchen & dining room for open concept at 2/f. propose four new skylights. two new windows on east exterior wall | $50,000 |
| Jun 27, 2025 | Completed final sign-off Jul 2025 | 123 Grattan St | revision to permit # 202504073840. kitchen and bathroom remodeling. replace new toilet, vanity, lights, and shower door at bathroom. replace new countertops and cabinets in kitchen. hood up appliances. replace damage entrance door for unit interior not exterior.Details
revision to permit # 202504073840. kitchen and bathroom remodeling. replace new toilet, vanity, lights, and shower door at bathroom. replace new countertops and cabinets in kitchen. hood up appliances. replace damage entrance door for unit interior not exterior. | $30,000 |
| Jun 24, 2025 | Completed final sign-off Feb 2026 | 144 Locksley Av | 2nd fl - to relocate (e) kitchen to living room; demo (e) fireplace; add half bathroom; add 1 officeDetails
2nd fl - to relocate (e) kitchen to living room; demo (e) fireplace; add half bathroom; add 1 office | $40,000 |
| Apr 7, 2025 | Completed final sign-off Jul 2025 | 123 Grattan St | replace (n) tiles on kitchen and bathroom. refinish hardwood flooring touch up and painting the unit. interior only. kitchen & bathroom remodel tile onlyDetails
replace (n) tiles on kitchen and bathroom. refinish hardwood flooring touch up and painting the unit. interior only. kitchen & bathroom remodel tile only | $10,000 |
| Aug 17, 2023 | Completed final sign-off Jun 2025 | 233 Lincoln Wy | interior remodeling to build a new 1-bedroom unit at 1st flr. (legal unit under density), new unit to include new kitchen, living and closets and laundry closet.Details
interior remodeling to build a new 1-bedroom unit at 1st flr. (legal unit under density), new unit to include new kitchen, living and closets and laundry closet. | $60,000 |
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 635 45th Av | replace tile on kitchen and guest bathroom. replace countertop on kitchen in kind.Details
replace tile on kitchen and guest bathroom. replace countertop on kitchen in kind. | $7,000 |
| Jul 30, 2019 | Completed final sign-off Jun 2020 | 1614 La Playa | add 1 guest room, 1 media room, 1 bathroom, 1 hallway on 1/f per plans. kitchen remodel on 2/f, add 1 bathroom, reconfigure (e) bathroom on 2/f.Details
add 1 guest room, 1 media room, 1 bathroom, 1 hallway on 1/f per plans. kitchen remodel on 2/f, add 1 bathroom, reconfigure (e) bathroom on 2/f. | $20,000 |
| Apr 29, 2019 | Completed final sign-off Oct 2019 | 240 Magellan Av | interior addtion of storage room and laundry @ ground fl. (n) enlarged opening in (e) load-bearing wall between kitchen and family room; replace 2 windos and add 1 (n) patio door in place of window at 2nd fl rear. remodel (e) kitchen and 1/2 bath @ 2nd fl. hvac, elec and lighting in area of workDetails
interior addtion of storage room and laundry @ ground fl. (n) enlarged opening in (e) load-bearing wall between kitchen and family room; replace 2 windos and add 1 (n) patio door in place of window at 2nd fl rear. remodel (e) kitchen and 1/2 bath @ 2nd fl. hvac, elec and lighting in area of work | $48,000 |
| Mar 29, 2019 | Completed final sign-off Aug 2020 | 2746 Cabrillo St | interior remodel 1st flr and 2nd flr. with 3 full bathrooms one powder room, kitchen & 3 bedrooms. replace all windows (fiberglass wood)Details
interior remodel 1st flr and 2nd flr. with 3 full bathrooms one powder room, kitchen & 3 bedrooms. replace all windows (fiberglass wood) | $120,000 |
| Nov 20, 2018 | Completed final sign-off Dec 2020 | 130 09th Av | revision to pa 201806010823. reconfigure rooms per plans. new wine storage at kitchen. remove stairs from deck at rearDetails
revision to pa 201806010823. reconfigure rooms per plans. new wine storage at kitchen. remove stairs from deck at rear | |
| Sep 27, 2018 | Never finaled issued Nov 2018, no final | 601 35th Av | construct 2 (n) family room & 2 (n) 1/2 bath room at ground floor. 2nd fl - remodel (e) kitchen and (e) bathroom. (n) bathroom, remove partial partition wall. no work on 3rd floor or at front facadeDetails
construct 2 (n) family room & 2 (n) 1/2 bath room at ground floor. 2nd fl - remodel (e) kitchen and (e) bathroom. (n) bathroom, remove partial partition wall. no work on 3rd floor or at front facade | $70,000 |
| Jul 10, 2018 | Completed final sign-off Oct 2020 | 225 Grafton Av | comply with compliant# 201870851,201870941 & 201870821. unit legaliztion of unit installed w/o permit per ord# 43-14. legalize kitchen, bed rm, full bath and family rm. all work @ grd flr.Details
comply with compliant# 201870851,201870941 & 201870821. unit legaliztion of unit installed w/o permit per ord# 43-14. legalize kitchen, bed rm, full bath and family rm. all work @ grd flr. | $42,000 |
| Jun 1, 2018 | Completed final sign-off Dec 2020 | 130 09th Av | 1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndwsDetails
1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndws | $100,000 |
| Nov 21, 2016 | Completed final sign-off Apr 2017 | 1978 48th Av | 1st floor: add 1 bedroom & 1 full bath. 2nd floor : remodel bath & kitchen.Details
1st floor: add 1 bedroom & 1 full bath. 2nd floor : remodel bath & kitchen. | $40,000 |
| Nov 10, 2016 | Completed final sign-off Jul 2017 | 490 Vermont St | 1)relocated kitchen and dining, remodel bath and add one bedroom and bath at 2nd floor. 2)add 2 bedrooms, 2 baths, family room and relocated washer and dryer at 1st floor per plan. n/a for maher.Details
1)relocated kitchen and dining, remodel bath and add one bedroom and bath at 2nd floor. 2)add 2 bedrooms, 2 baths, family room and relocated washer and dryer at 1st floor per plan. n/a for maher. | $89,700 |
| Oct 27, 2016 | Never finaled issued Oct 2017, no final | 2826 Gough St | rear structure - add family room, den, kitchen & living room on 1/f, add interior stair case to create interior connection between 1/f & 2/f (unit #c), re-configure interior layout on 2/f.Details
rear structure - add family room, den, kitchen & living room on 1/f, add interior stair case to create interior connection between 1/f & 2/f (unit #c), re-configure interior layout on 2/f. | $60,000 |