Building Construction Express
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Sep 2026
- Last 24 months
- 13 permits filed
41 permits since 2000: 27 completed, 6 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 expired or cancelled. Typically 22 days from filing to permit and 882 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2023 | Completed final sign-off Sep 2026 | 622 19th Av | remodel 2/f dining, living room and bathroom,remodel and relocate kitcyen and add 1 new office on 2/f. add new exterior deck with staircase to rear yard on 2/f.Details
remodel 2/f dining, living room and bathroom,remodel and relocate kitcyen and add 1 new office on 2/f. add new exterior deck with staircase to rear yard on 2/f. | $150,000 |
| Nov 20, 2018 | Completed final sign-off Dec 2020 | 130 09th Av | revision to pa 201806010823. reconfigure rooms per plans. new wine storage at kitchen. remove stairs from deck at rearDetails
revision to pa 201806010823. reconfigure rooms per plans. new wine storage at kitchen. remove stairs from deck at rear | |
| Jun 1, 2018 | Completed final sign-off Dec 2020 | 130 09th Av | 1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndwsDetails
1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndws | $100,000 |
| Jan 4, 2018 | Expired or cancelled expired Dec 2024 | 82 Mill St | construct two bedrooms, two full bathrooms at ground floor. construct new deck at rear of bldg w/staircase (size approx 16'x15').Details
construct two bedrooms, two full bathrooms at ground floor. construct new deck at rear of bldg w/staircase (size approx 16'x15'). | $60,000 |