Back to kitchen remodel contractors
Building By Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Jun 2026
- Last 24 months
- 1 permit filed
46 permits since 2000: 37 completed, 2 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 8 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2023 | Completed final sign-off Jun 2023 | 1386 La Playa | repair water damaged exissting kitchen, sink, base cabinet and corner cabinet. replace in kind, replace countertop anad back splash, reinstall existing kitchen sink, replace existing gfci counter plug.kitchen remodel: no structural work- no wall/ framing modification.Details
repair water damaged exissting kitchen, sink, base cabinet and corner cabinet. replace in kind, replace countertop anad back splash, reinstall existing kitchen sink, replace existing gfci counter plug.kitchen remodel: no structural work- no wall/ framing modification. | $4,800 |
| Aug 4, 2022 | Expired or cancelled cancelled Jan 2026 | 5 Piedmont St | revision to comply with pa#202207017639, remove no work to upgrade of kitchen @ unit #2 add laundry hook-up, add additional laundry hook-up to unit#'s 1,3,4. build prtitions to seperate laundry at unit landings at door.Details
revision to comply with pa#202207017639, remove no work to upgrade of kitchen @ unit #2 add laundry hook-up, add additional laundry hook-up to unit#'s 1,3,4. build prtitions to seperate laundry at unit landings at door. | |
| Jul 1, 2022 | Never finaled issued Jul 2022, no final | 5 Piedmont St | upgrade kitchen cabinets & counter top in kind. add laundry hook up.Details
upgrade kitchen cabinets & counter top in kind. add laundry hook up. | $27,000 |
| May 19, 2022 | Completed final sign-off Apr 2023 | 195 20th Av | unit 5: update kitchen and bathroom cabinets and countertops add laundry hookupDetails
unit 5: update kitchen and bathroom cabinets and countertops add laundry hookup | $20,000 |
| May 26, 2017 | Never finaled issued Dec 2017, no final | 1311 Palou Av | 1313a palou avenue: renovation of (e) unit on 1st floor, lower level - demo (e) bath at rear of house. demo all interior walls. remodel (e) kitchen, remodel 1 existing bath and add 1 new bathroom. new bedroom, new office, new deck area under (e) deck aboveDetails
1313a palou avenue: renovation of (e) unit on 1st floor, lower level - demo (e) bath at rear of house. demo all interior walls. remodel (e) kitchen, remodel 1 existing bath and add 1 new bathroom. new bedroom, new office, new deck area under (e) deck above | $110,000 |
| Jun 14, 2016 | Completed final sign-off Dec 2017 | 1311 Palou Av | revision to 201604195096. 1/f new partition wall to create 2 new bedrooms. new partition wall btwn e kit/e bath. n laundry/n bath. infill e wndws bath,kitch,pantry. n widws kitchen, e bath,n bath. 2/f new partiton wall to create new bedrm,n wall btwn e kit/bath, n lndry,n bath,infill eDetails
revision to 201604195096. 1/f new partition wall to create 2 new bedrooms. new partition wall btwn e kit/e bath. n laundry/n bath. infill e wndws bath,kitch,pantry. n widws kitchen, e bath,n bath. 2/f new partiton wall to create new bedrm,n wall btwn e kit/bath, n lndry,n bath,infill e | $20,000 |
| Apr 19, 2016 | Never finaled issued Apr 2016, no final | 1311 Palou Av | renovation of kitchen and bathroom on 2nd floor and renovation of kitchen and bathroom on 1st floor (entry level). no change to walls, doors and openingsDetails
renovation of kitchen and bathroom on 2nd floor and renovation of kitchen and bathroom on 1st floor (entry level). no change to walls, doors and openings | $65,000 |
| Aug 31, 2015 | Completed final sign-off Aug 2016 | 450 Noe St | relocate extg kitchen and bathroom on l2. relocate extg kitchen on l3. add new bathroom on l2. relocate window on l3(not visible from street)Details
relocate extg kitchen and bathroom on l2. relocate extg kitchen on l3. add new bathroom on l2. relocate window on l3(not visible from street) | $10,000 |
| Apr 29, 2015 | Completed final sign-off Jul 2015 | 1442 14th Av | replace tile & vanity in (1) bathroom; replace cabinets, countertop, & floor upgrade lights to led in (1) kitchen.Details
replace tile & vanity in (1) bathroom; replace cabinets, countertop, & floor upgrade lights to led in (1) kitchen. | $39,800 |
| Sep 12, 2011 | Completed final sign-off Nov 2011 | 531 Vermont St | replace kitchen cabinet, counter top, replace sink, stove, relocate refrigerator, remove pocket door & change into doorway. lighting must comply with cec150(k)Details
replace kitchen cabinet, counter top, replace sink, stove, relocate refrigerator, remove pocket door & change into doorway. lighting must comply with cec150(k) | $28,450 |
| Jun 21, 2010 | Completed final sign-off Sep 2010 | 483 Hazelwood Av | remodel 2nd fl bath. 1st fl kitchen bath replace extng tub, vanity, shower. kitchen replace cabinetry, appliances, counters, flr. provide high efficiency lighting & switches per title 24 mandatory lighting measures.Details
remodel 2nd fl bath. 1st fl kitchen bath replace extng tub, vanity, shower. kitchen replace cabinetry, appliances, counters, flr. provide high efficiency lighting & switches per title 24 mandatory lighting measures. | $55,000 |
| Jan 10, 2008 | Completed final sign-off Mar 2008 | 1930 Jackson St | existing kitchen face lift. change out existing cabinets, countertops, floor. kitchen configuration to remain. replace existing door to exterior stairwell. repair 3-4 stairwells,treads due to dryrot. replace in kind. less than 50% in kind for stairway.Details
existing kitchen face lift. change out existing cabinets, countertops, floor. kitchen configuration to remain. replace existing door to exterior stairwell. repair 3-4 stairwells,treads due to dryrot. replace in kind. less than 50% in kind for stairway. | $22,700 |