Back to bathroom remodel contractors
Building By Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Jun 2026
- Last 24 months
- 1 permit filed
46 permits since 2000: 37 completed, 2 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 1 in progress, 2 never finaled. Typically 4 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2024 | In progress issued Aug 2024 | 2226 25th Av | convert (e) garage conversion to new family , office, studio with laundry and bathroom at ground level.Details
convert (e) garage conversion to new family , office, studio with laundry and bathroom at ground level. | $218,000 |
| Dec 12, 2023 | Completed final sign-off Jun 2024 | 1717 Alabama St | (e) 2nd fl bathroom & w/c room to be converted into one bathroom. wall in w/c door, rehang bath door to swing out into laundry area. remove interior partition between bath and wc.Details
(e) 2nd fl bathroom & w/c room to be converted into one bathroom. wall in w/c door, rehang bath door to swing out into laundry area. remove interior partition between bath and wc. | $33,700 |
| May 19, 2022 | Completed final sign-off Apr 2023 | 195 20th Av | unit 5: update kitchen and bathroom cabinets and countertops add laundry hookupDetails
unit 5: update kitchen and bathroom cabinets and countertops add laundry hookup | $20,000 |
| Mar 13, 2019 | Completed final sign-off May 2019 | 598 Guerrero St | non-structural partitions in basement for storage, movement of existing non sturctural partition on main floor. addition of employee use bathroom replacement of door. upgrade bar, entry, bathroom for ada costmetic finishes and repairs. deffered mech and lighting.Details
non-structural partitions in basement for storage, movement of existing non sturctural partition on main floor. addition of employee use bathroom replacement of door. upgrade bar, entry, bathroom for ada costmetic finishes and repairs. deffered mech and lighting. | $50,000 |
| Mar 12, 2018 | Completed final sign-off Sep 2018 | 1542 09th Av | 1st floor ground level bathroom - replace tub & shower with new pre fab shower pan & tile pan & walls at shower. add 1 led fan light in each bath. no alteration at wall, window and doorDetails
1st floor ground level bathroom - replace tub & shower with new pre fab shower pan & tile pan & walls at shower. add 1 led fan light in each bath. no alteration at wall, window and door | $9,200 |
| May 26, 2017 | Never finaled issued Dec 2017, no final | 1311 Palou Av | 1313a palou avenue: renovation of (e) unit on 1st floor, lower level - demo (e) bath at rear of house. demo all interior walls. remodel (e) kitchen, remodel 1 existing bath and add 1 new bathroom. new bedroom, new office, new deck area under (e) deck aboveDetails
1313a palou avenue: renovation of (e) unit on 1st floor, lower level - demo (e) bath at rear of house. demo all interior walls. remodel (e) kitchen, remodel 1 existing bath and add 1 new bathroom. new bedroom, new office, new deck area under (e) deck above | $110,000 |
| Jan 20, 2017 | Completed final sign-off Apr 2017 | 329 Richland Av | remodel (e) bathroom , replace (e) fixture in kind replace toilet.vaity & shower pan, retile shower floor add exaust fan new medicine cabinetDetails
remodel (e) bathroom , replace (e) fixture in kind replace toilet.vaity & shower pan, retile shower floor add exaust fan new medicine cabinet | $21,700 |
| Sep 13, 2016 | Completed final sign-off Jul 2018 | 119 Ripley St | conversion of a 635 sq ft storage space to habitable home office/play room with a new bathroom. space dedicated to unit 119.Details
conversion of a 635 sq ft storage space to habitable home office/play room with a new bathroom. space dedicated to unit 119. | $64,837 |
| Jun 14, 2016 | Completed final sign-off Dec 2017 | 1311 Palou Av | revision to 201604195096. 1/f new partition wall to create 2 new bedrooms. new partition wall btwn e kit/e bath. n laundry/n bath. infill e wndws bath,kitch,pantry. n widws kitchen, e bath,n bath. 2/f new partiton wall to create new bedrm,n wall btwn e kit/bath, n lndry,n bath,infill eDetails
revision to 201604195096. 1/f new partition wall to create 2 new bedrooms. new partition wall btwn e kit/e bath. n laundry/n bath. infill e wndws bath,kitch,pantry. n widws kitchen, e bath,n bath. 2/f new partiton wall to create new bedrm,n wall btwn e kit/bath, n lndry,n bath,infill e | $20,000 |
| Apr 19, 2016 | Never finaled issued Apr 2016, no final | 1311 Palou Av | renovation of kitchen and bathroom on 2nd floor and renovation of kitchen and bathroom on 1st floor (entry level). no change to walls, doors and openingsDetails
renovation of kitchen and bathroom on 2nd floor and renovation of kitchen and bathroom on 1st floor (entry level). no change to walls, doors and openings | $65,000 |
| Aug 31, 2015 | Completed final sign-off Aug 2016 | 450 Noe St | relocate extg kitchen and bathroom on l2. relocate extg kitchen on l3. add new bathroom on l2. relocate window on l3(not visible from street)Details
relocate extg kitchen and bathroom on l2. relocate extg kitchen on l3. add new bathroom on l2. relocate window on l3(not visible from street) | $10,000 |
| Apr 29, 2015 | Completed final sign-off Jul 2015 | 1442 14th Av | replace tile & vanity in (1) bathroom; replace cabinets, countertop, & floor upgrade lights to led in (1) kitchen.Details
replace tile & vanity in (1) bathroom; replace cabinets, countertop, & floor upgrade lights to led in (1) kitchen. | $39,800 |
| Sep 27, 2013 | Completed final sign-off Jan 2014 | 660 Sacramento St | convert existing 2/f bathrooms to ada compliant, upgrade accessibility to 2/f men & women bathrooms.Details
convert existing 2/f bathrooms to ada compliant, upgrade accessibility to 2/f men & women bathrooms. | $24,000 |
| Mar 8, 2013 | Completed final sign-off Sep 2013 | 1566 Plymouth Av | (e) non habitable basement conversion into habitable living, family & bedroom. relocate laundry & bathroom.add new window double hung wood frame.Details
(e) non habitable basement conversion into habitable living, family & bedroom. relocate laundry & bathroom.add new window double hung wood frame. | $39,500 |
| Nov 30, 2012 | Completed final sign-off Feb 2015 | 496 Urbano Dr | as built interior 2 stud wood framing, partitions in basement (e) half bath to a full bathroom at ground level/basement. change (e) basement area into 1 family room, new closets, new office & new basement storage, new hallway & egress/exit door to urbano dr, new laundry area (n) egress window forDetails
as built interior 2 stud wood framing, partitions in basement (e) half bath to a full bathroom at ground level/basement. change (e) basement area into 1 family room, new closets, new office & new basement storage, new hallway & egress/exit door to urbano dr, new laundry area (n) egress window for | $22,600 |
| Apr 15, 2011 | Completed final sign-off Jun 2011 | 1076 Noe St | replace tile foor and shower/bath surround the walls. replace (e) toilet w/ low flow & pedestal sink. replace w/ new pedestal sink. replace medicine cabinet. no remodel of bathroom.Details
replace tile foor and shower/bath surround the walls. replace (e) toilet w/ low flow & pedestal sink. replace w/ new pedestal sink. replace medicine cabinet. no remodel of bathroom. | $2,400 |
| Jun 21, 2010 | Completed final sign-off Sep 2010 | 483 Hazelwood Av | remodel 2nd fl bath. 1st fl kitchen bath replace extng tub, vanity, shower. kitchen replace cabinetry, appliances, counters, flr. provide high efficiency lighting & switches per title 24 mandatory lighting measures.Details
remodel 2nd fl bath. 1st fl kitchen bath replace extng tub, vanity, shower. kitchen replace cabinetry, appliances, counters, flr. provide high efficiency lighting & switches per title 24 mandatory lighting measures. | $55,000 |
| Jun 1, 2010 | Completed final sign-off Aug 2010 | 66 Cleary Ct | remodel bathroom. remove bathtub, change to shower only. replace sink and vanity. add 1 ceiling light with occupancy switch.move tub drain for new shower pan. work in unit 1510 onlyDetails
remodel bathroom. remove bathtub, change to shower only. replace sink and vanity. add 1 ceiling light with occupancy switch.move tub drain for new shower pan. work in unit 1510 only | $8,500 |
| Feb 7, 2001 | Completed final sign-off Nov 2001 | 239 Caselli Av | add half bath, storage & exercise rm into garage basement areaDetails
add half bath, storage & exercise rm into garage basement area | $46,400 |