Buck Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Mar 2026
- Last 24 months
- 3 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2019 | Completed final sign-off Jan 2020 | 176 Marview Wy | tear-out and replace less than 50% exterior roof deck. replace drain. new water proof membrane, dry pack, tile, lath wall with weep, 2-ply paper and metal lath. stucco to match existing texture and paint. repair in kind and less than 50%Details
tear-out and replace less than 50% exterior roof deck. replace drain. new water proof membrane, dry pack, tile, lath wall with weep, 2-ply paper and metal lath. stucco to match existing texture and paint. repair in kind and less than 50% | $11,900 |