Back to kitchen remodel contractors
Buck Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Mar 2026
- Last 24 months
- 3 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 22 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2023 | Completed final sign-off Jul 2024 | 1222 Page St | renovate kitchen and 2 full baths. replace 5 windows at side alley (not visible from st)Details
renovate kitchen and 2 full baths. replace 5 windows at side alley (not visible from st) | $95,000 |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 1220 Page St | renovate kitchen & full bath. new cabinets, fixtures & tile. replace 5 9e) windows at sides (not visible to street).Details
renovate kitchen & full bath. new cabinets, fixtures & tile. replace 5 9e) windows at sides (not visible to street). | $75,000 |