Back to kitchen remodel contractors
Bruce Webster
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2008
- Last 24 months
- 0 permits filed
82 permits since 2000: 68 completed, 5 never finaled, 9 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 never finaled. Typically 0 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2008 | Completed final sign-off Sep 2008 | 532 Bella Vista Wy | remove bearing wall in kitchen and support w/ metal beam, new 4x10 roof lintel (9' span), new (1) 24"x24" sq, skylight in kitchen.Details
remove bearing wall in kitchen and support w/ metal beam, new 4x10 roof lintel (9' span), new (1) 24"x24" sq, skylight in kitchen. | |
| Jul 30, 2008 | Completed final sign-off Sep 2008 | 532 Bella Vista Wy | kitchen & bath remodel on 2nd floor. 20 lf counter upper & lower. faucet, sink, dish washer.Details
kitchen & bath remodel on 2nd floor. 20 lf counter upper & lower. faucet, sink, dish washer. | $35,000 |
| Nov 13, 2007 | Completed final sign-off Jan 2008 | 173 Marietta Dr | 1 kitchen remodel.Details
1 kitchen remodel. | $27,500 |
| Jul 6, 2005 | Never finaled issued Jul 2005, no final | 14 Encline Ct | kitchen remodel. no structural work. install new cabinets & appliances etc.Details
kitchen remodel. no structural work. install new cabinets & appliances etc. | $25,000 |
| Sep 10, 2004 | Completed final sign-off Nov 2004 | 161 Evelyn Wy | kitchen remodelDetails
kitchen remodel | $30,000 |
| Jan 28, 2004 | Completed final sign-off Feb 2004 | 785 Golden Gate Av | kitchen and bath remodelDetails
kitchen and bath remodel | $32,000 |
| Sep 9, 2003 | Completed final sign-off Oct 2003 | 119 Encline Ct | kitchen remodel.Details
kitchen remodel. | $22,500 |
| Jun 10, 2003 | Completed final sign-off Sep 2003 | 1 Malta Dr | kitchen & 1/2 bath remodel. same location & same size.Details
kitchen & 1/2 bath remodel. same location & same size. | $22,000 |
| Aug 2, 2002 | Completed final sign-off Oct 2002 | 692 Teresita Bl | kitchen remodel. no structural workDetails
kitchen remodel. no structural work | $22,000 |
| Jul 12, 2002 | Completed final sign-off Aug 2002 | 872 Clayton St | install furnace, remodel bath & kitchenDetails
install furnace, remodel bath & kitchen | $18,000 |
| Jan 23, 2002 | Completed final sign-off May 2002 | 479 Church St | partial remodel kitchen-cabinets, move sink, countertop.Details
partial remodel kitchen-cabinets, move sink, countertop. | $8,500 |
| Feb 21, 2001 | Completed final sign-off Mar 2001 | 479 Church St | kitchen remodel. cabinets, counter tops, sink, 12 ft of cabinets.Details
kitchen remodel. cabinets, counter tops, sink, 12 ft of cabinets. | $6,000 |
| Jan 16, 2001 | Completed final sign-off Mar 2001 | 626 Rockdale Dr | kitchen remodel & basement hall construction, non-structural work onlyDetails
kitchen remodel & basement hall construction, non-structural work only | $15,000 |