Bruce Webster

Contractor license
711232
State license record
Based in
San Francisco
On San Francisco permits
Feb 2000 to Aug 2008
Last 24 months
0 permits filed

82 permits since 2000: 68 completed, 5 never finaled, 9 expired or cancelled.

Of the 5 never-finaled permits, 5 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Deck permits

AllDeck 9Stairs 8Kitchen remodel 13Bathroom remodel 9

9 deck permits: 7 completed, 2 never finaled. Typically 0 days from filing to permit and 89 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Oct 6, 2006Completed
final sign-off Jan 2007
629 Teresita Blreplace exist deck & handrails on 2 decks at rear of property not structural work to be done (e) cantilevered supports to remain. handrail 36 in high min. metal rail 4 in max between pickets.
Details
Permit
200610064364
Status
complete
Filed
Oct 6, 2006
Permit issued
Oct 6, 2006
Final sign-off
Jan 3, 2007
Declared cost
$19,500
Address
629 Teresita Bl

replace exist deck & handrails on 2 decks at rear of property not structural work to be done (e) cantilevered supports to remain. handrail 36 in high min. metal rail 4 in max between pickets.

Open the permit page

$19,500
Jul 12, 2005Completed
final sign-off Nov 2005
50 Malta Drless than 50 percent being replaced- replace existing decking w/trex; repair dry rot where found, tw
Details
Permit
200507127362
Status
complete
Filed
Jul 12, 2005
Permit issued
Jul 12, 2005
Final sign-off
Nov 17, 2005
Declared cost
$6,500
Address
50 Malta Dr

less than 50 percent being replaced- replace existing decking w/trex; repair dry rot where found, tw

Open the permit page

$6,500
Jan 19, 2005Completed
final sign-off Aug 2005
403 Marietta Drreplace 2 windows and replace damaged decking less than 50% of rear deck replace alum single glaze
Details
Permit
200501193440
Status
complete
Filed
Jan 19, 2005
Permit issued
Jan 19, 2005
Final sign-off
Aug 8, 2005
Declared cost
$12,000
Address
403 Marietta Dr

replace 2 windows and replace damaged decking less than 50% of rear deck replace alum single glaze

Open the permit page

$12,000
Apr 16, 2004Completed
final sign-off Mar 2005
101 Melrose Avremove (e) lower deck, replace w/ new lower & upper deck, add door to new upper deck
Details
Permit
200404161515
Status
complete
Filed
Apr 16, 2004
Permit issued
Sep 1, 2004
Final sign-off
Mar 18, 2005
Declared cost
$20,000
Address
101 Melrose Av

remove (e) lower deck, replace w/ new lower & upper deck, add door to new upper deck

Open the permit page

$20,000
Sep 3, 2003Never finaled
issued Sep 2003, no final
115 Marietta Drrelocation of spiral stair in proposed deck (within deck area) revision to #2002/08/30/5346-r-1
Details
Permit
200309033725
Status
issued
Filed
Sep 3, 2003
Permit issued
Sep 3, 2003
Address
115 Marietta Dr

relocation of spiral stair in proposed deck (within deck area) revision to #2002/08/30/5346-r-1

Open the permit page

Feb 11, 2003Completed
final sign-off Apr 2003
59 Teresita Blrev#200211151601 for deck replacement to original size
Details
Permit
200302117258
Status
complete
Filed
Feb 11, 2003
Permit issued
Feb 11, 2003
Final sign-off
Apr 24, 2003
Address
59 Teresita Bl

rev#200211151601 for deck replacement to original size

Open the permit page

Aug 30, 2002Completed
final sign-off Apr 2003
532 Myra Wyadd wood deck, esterior stairs, replace existing opening w french doors
Details
Permit
200208305345
Status
complete
Filed
Aug 30, 2002
Permit issued
Mar 20, 2003
Final sign-off
Apr 25, 2003
Declared cost
$10,000
Address
532 Myra Wy

add wood deck, esterior stairs, replace existing opening w french doors

Open the permit page

$10,000
Aug 16, 2002Completed
final sign-off Sep 2002
131 Encline Ctreplace (e) wood deck off of 2/fl., replace (3) windows & sliding glass door
Details
Permit
200208164142
Status
complete
Filed
Aug 16, 2002
Permit issued
Aug 16, 2002
Final sign-off
Sep 3, 2002
Declared cost
$9,500
Address
131 Encline Ct

replace (e) wood deck off of 2/fl., replace (3) windows & sliding glass door

Open the permit page

$9,500
Apr 25, 2000Never finaled
filed Apr 2000, never issued
399 Melrose Avconstruction of 2 redwood decks-horizontal addition
Details
Permit
200004258101
Status
filed
Filed
Apr 25, 2000
Declared cost
$5,500
Address
399 Melrose Av

construction of 2 redwood decks-horizontal addition

Open the permit page

$5,500