Back to kitchen remodel contractors
Brothers Collins Woodworking Inc
- Based in
- Cotati
- On San Francisco permits
- Aug 2013 to Jul 2026
- Last 24 months
- 6 permits filed
48 permits since 2000: 31 completed, 4 in progress, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 1 in progress, 1 never finaled. Typically 49 days from filing to permit and 492 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2025 | In progress issued Apr 2026 | 78 Eastwood Dr | remodel/reconfigure (e) kitchen, remodel /reconfigure (e) full bath. add second full bath. reconfigure (e) stairs down to (e) garageDetails
remodel/reconfigure (e) kitchen, remodel /reconfigure (e) full bath. add second full bath. reconfigure (e) stairs down to (e) garage | $90,000 |
| Feb 20, 2024 | Completed final sign-off Dec 2024 | 838 43rd Av | kitchen & bath remodel, selective demo of finishes, fixtures in area of work. new fixtures, finishes & cabinets to be provided, mep under separate permit. add 2 skylights, replace (e) window with garden window, replace (e) sliding door at porch. no change in size or location.Details
kitchen & bath remodel, selective demo of finishes, fixtures in area of work. new fixtures, finishes & cabinets to be provided, mep under separate permit. add 2 skylights, replace (e) window with garden window, replace (e) sliding door at porch. no change in size or location. | $97,000 |
| Jun 7, 2022 | Completed final sign-off Mar 2024 | 53 Winfield St | bathroom, kitchen, laundry remodel. remove & replace windows. not visible from street.Details
bathroom, kitchen, laundry remodel. remove & replace windows. not visible from street. | $65,000 |
| Dec 14, 2021 | Completed final sign-off Mar 2024 | 70 Putnam St | infill of (e) 2nd fl lightwell (which is adjacent to vacant lot), interior remodel to expand & redo (e) kitchen, (n) skylight @ kitchen, roof parapet adjacent to skylight.Details
infill of (e) 2nd fl lightwell (which is adjacent to vacant lot), interior remodel to expand & redo (e) kitchen, (n) skylight @ kitchen, roof parapet adjacent to skylight. | $49,500 |
| Feb 5, 2020 | Never finaled issued May 2021, no final | 47 Skyview Wy | add around 50 sq feet for each fl @ south side of bldg, remodel(e)rooms, kitchen & bathrm, add(1)bathrm, replace internal stairs w/ spiral staircase, expand living rm, relocate gas fireplace, repair/replace ext'r stairs, deck, windows as needed to repair problems in contractors report.total 3br/3baDetails
add around 50 sq feet for each fl @ south side of bldg, remodel(e)rooms, kitchen & bathrm, add(1)bathrm, replace internal stairs w/ spiral staircase, expand living rm, relocate gas fireplace, repair/replace ext'r stairs, deck, windows as needed to repair problems in contractors report.total 3br/3ba | $197,000 |
| Jul 24, 2019 | Completed final sign-off Dec 2020 | 1332 Diamond St | cosmetic facade remodel and partial infill of the entry portal. interior remodeling to replace the entry stair in-kind with an added top step, open the top of the entry stair to the 2nd fl hall, remodel kitchen, dining room, and bath. replacement windows and a replacement skylight.Details
cosmetic facade remodel and partial infill of the entry portal. interior remodeling to replace the entry stair in-kind with an added top step, open the top of the entry stair to the 2nd fl hall, remodel kitchen, dining room, and bath. replacement windows and a replacement skylight. | $220,000 |
| Jul 19, 2019 | Completed final sign-off Dec 2020 | 1332 Diamond St | remodel (e) bathroom on 2nd floor in kind. remove carpet/hardwoood floors. exploratory demo @ bathoom 8'x7', kitchen of lath and plaster in search of dry rot approx 100 sq ft repair in kind.Details
remodel (e) bathroom on 2nd floor in kind. remove carpet/hardwoood floors. exploratory demo @ bathoom 8'x7', kitchen of lath and plaster in search of dry rot approx 100 sq ft repair in kind. | $20,000 |
| Sep 19, 2018 | Completed final sign-off Nov 2019 | 1471 15th Av | remodel of (e) single family residence. 1)remodel portoin of 9e) garage to include master suite, media room& laundry. 2) remodel of (e) kitchen & portion of 2/f, 3) add conecting stair between 2/f & g/f. maher n/a.Details
remodel of (e) single family residence. 1)remodel portoin of 9e) garage to include master suite, media room& laundry. 2) remodel of (e) kitchen & portion of 2/f, 3) add conecting stair between 2/f & g/f. maher n/a. | $150,000 |
| Dec 15, 2016 | Completed final sign-off Oct 2019 | 70 Putnam St | addition of a bedroom, bath, laundry room, storage and a hall to the (e) ground fl interior. infill of the (e) covered north lightwell, and a (n) interior stair between floors at the infill. removal of the (e) interior stair to create a pantry. removal of wall portion between entry hall and kitchenDetails
addition of a bedroom, bath, laundry room, storage and a hall to the (e) ground fl interior. infill of the (e) covered north lightwell, and a (n) interior stair between floors at the infill. removal of the (e) interior stair to create a pantry. removal of wall portion between entry hall and kitchen | $97,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2020 | 70 Putnam St | install 3 skylights & 1 skylight/roof access hatch. 1 roof parapet @ ea side prop line. reooftop exhaust fan for kitchen range hood & replace hood. 4 in-kind replace double hung windows @ bedrms. handrail at entry & int. stairs. vents @ garage door, heat pump ducted heating system, on-demandDetails
install 3 skylights & 1 skylight/roof access hatch. 1 roof parapet @ ea side prop line. reooftop exhaust fan for kitchen range hood & replace hood. 4 in-kind replace double hung windows @ bedrms. handrail at entry & int. stairs. vents @ garage door, heat pump ducted heating system, on-demand | $40,000 |
| Aug 1, 2013 | Completed final sign-off Oct 2013 | 34 Lagunitas Dr | kitchen remodel - demo (e) kitchen down to studs. new kitchen to remain in same location as (e) kitchen. install new drywall cabinets, counters & floors. replace (e) new window with new wood window using (e) opening (not visible from street).Details
kitchen remodel - demo (e) kitchen down to studs. new kitchen to remain in same location as (e) kitchen. install new drywall cabinets, counters & floors. replace (e) new window with new wood window using (e) opening (not visible from street). | $69,000 |