Brothers Collins Woodworking Inc
- Based in
- Cotati
- On San Francisco permits
- Aug 2013 to Jul 2026
- Last 24 months
- 6 permits filed
48 permits since 2000: 31 completed, 4 in progress, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 196 days from filing to permit and 338 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2023 | Completed final sign-off Jul 2023 | 642 Chenery St | repair dryrot, like for like, replacement on rear exit stair nailing and unit #4 deck joist as per complaint #202298503- less than 50%Details
repair dryrot, like for like, replacement on rear exit stair nailing and unit #4 deck joist as per complaint #202298503- less than 50% | $1,750 |
| Feb 5, 2020 | Never finaled issued May 2021, no final | 47 Skyview Wy | add around 50 sq feet for each fl @ south side of bldg, remodel(e)rooms, kitchen & bathrm, add(1)bathrm, replace internal stairs w/ spiral staircase, expand living rm, relocate gas fireplace, repair/replace ext'r stairs, deck, windows as needed to repair problems in contractors report.total 3br/3baDetails
add around 50 sq feet for each fl @ south side of bldg, remodel(e)rooms, kitchen & bathrm, add(1)bathrm, replace internal stairs w/ spiral staircase, expand living rm, relocate gas fireplace, repair/replace ext'r stairs, deck, windows as needed to repair problems in contractors report.total 3br/3ba | $197,000 |
| Oct 7, 2019 | Completed final sign-off Apr 2020 | 5 Gladeview Wy | rev 201706209868; provide structural for spiral stair & deckDetails
rev 201706209868; provide structural for spiral stair & deck | |
| Jun 20, 2017 | Completed final sign-off Apr 2020 | 5 Gladeview Wy | new enlarged deck to replace existing, replace (e) fence, & lower patio. new doors & window to deck. new lighting for deck & gasline for bbq.Details
new enlarged deck to replace existing, replace (e) fence, & lower patio. new doors & window to deck. new lighting for deck & gasline for bbq. | $40,000 |
| Apr 17, 2017 | Completed final sign-off Mar 2018 | 635 Mangels Av | build family room and bathroom in existing basement. add landing with steps down to existing deck.Details
build family room and bathroom in existing basement. add landing with steps down to existing deck. | $120,000 |
| Dec 30, 2015 | Expired or cancelled cancelled Sep 2017 | 635 Mangels Av | 223 sq ft rear deck at 2nd storyDetails
223 sq ft rear deck at 2nd story | $40,000 |
| Dec 19, 2014 | Completed final sign-off Jun 2016 | 566 Eureka St | 6' deep, 1 story tall rear building addition at gr floor, 30" tall max landing and stair addition of exsiting deck. replacement of exterior wall finish at rear of house, interior remodeling at gr fl and dining room, including skylight, terracing of rear yard with new stairs, planters and walways,Details
6' deep, 1 story tall rear building addition at gr floor, 30" tall max landing and stair addition of exsiting deck. replacement of exterior wall finish at rear of house, interior remodeling at gr fl and dining room, including skylight, terracing of rear yard with new stairs, planters and walways, | $187,000 |
| May 20, 2014 | Completed final sign-off Dec 2015 | 3173 Turk Bl | rear bldg addition at all three floors (crawlspace at groud floor portion) with roof deck at third floor, rear deck addition at second floor, and interior remodeling at all floors. new bath at second floor.Details
rear bldg addition at all three floors (crawlspace at groud floor portion) with roof deck at third floor, rear deck addition at second floor, and interior remodeling at all floors. new bath at second floor. | $255,000 |