Brody Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Mar 2017
- Last 24 months
- 0 permits filed
20 permits since 2000: 17 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2017 | Never finaled issued Mar 2017, no final | 1330 Grove St | to comply with nov# 201762531, 201763701 & 201763691. repair damaged wood siding & rear stairs. repair front top step of entrance. remove mildew & mold frame units & pre-paint. re patch walls. fix broken windows at rear & light switch. n/a for maher.Details
to comply with nov# 201762531, 201763701 & 201763691. repair damaged wood siding & rear stairs. repair front top step of entrance. remove mildew & mold frame units & pre-paint. re patch walls. fix broken windows at rear & light switch. n/a for maher. | $25,000 |
| May 20, 2013 | Completed final sign-off Feb 2015 | 915 Ashbury St | replace wood decks off of 1st & 2nd floor with new decks & sturcture. replace stair form 1st floor to garden. add convenience stair from 1st to 2nd floor. add small deck at 3rd floor. perform voluntary structural upgrade to rear (west) wall.Details
replace wood decks off of 1st & 2nd floor with new decks & sturcture. replace stair form 1st floor to garden. add convenience stair from 1st to 2nd floor. add small deck at 3rd floor. perform voluntary structural upgrade to rear (west) wall. | $50,000 |
| Jul 22, 2005 | Never finaled issued Jul 2005, no final | 2153 15th St | rebuild front stairs in kind. existing structural supports to remain. replace steps only. less thanDetails
rebuild front stairs in kind. existing structural supports to remain. replace steps only. less than | $4,000 |
| Jul 27, 2004 | Completed final sign-off Sep 2004 | 1803 Cabrillo St | repair rear stairs,handrails,landings,posts for railingsDetails
repair rear stairs,handrails,landings,posts for railings | $1,800 |
| Aug 2, 2002 | Completed final sign-off Jan 2003 | 2590 32nd Av | revise 961012 stairway at garage.and structural detail for n. window.Details
revise 961012 stairway at garage.and structural detail for n. window. |