Brody Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Mar 2017
- Last 24 months
- 0 permits filed
20 permits since 2000: 17 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 114 days from filing to permit and 504 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2015 | Completed final sign-off May 2017 | 143 Graystone Tr | nov 201552863- replace deck in kind item #1,2,repair damaged walls & ceiling in lower unit, item #3; source of water damage-replace 2 (e) doors in kind item #6.Details
nov 201552863- replace deck in kind item #1,2,repair damaged walls & ceiling in lower unit, item #3; source of water damage-replace 2 (e) doors in kind item #6. | $60,000 |
| May 20, 2013 | Completed final sign-off Feb 2015 | 915 Ashbury St | replace wood decks off of 1st & 2nd floor with new decks & sturcture. replace stair form 1st floor to garden. add convenience stair from 1st to 2nd floor. add small deck at 3rd floor. perform voluntary structural upgrade to rear (west) wall.Details
replace wood decks off of 1st & 2nd floor with new decks & sturcture. replace stair form 1st floor to garden. add convenience stair from 1st to 2nd floor. add small deck at 3rd floor. perform voluntary structural upgrade to rear (west) wall. | $50,000 |