Back to kitchen remodel contractors
Briody Construction
- Based in
- Daly City
- On San Francisco permits
- Oct 2008 to Jul 2011
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 12 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2011 | Never finaled issued Jul 2011, no final | 535 Laurel St | remodel gr fl, add full bath at ent rm and rewire gr/1st floor except kitchen. raise door heights at interior doors by 6", replace interior doors, replace back door, back patio door, back powder room window , install new wood floors, skim walls and ceilings, paint,add new basebdDetails
remodel gr fl, add full bath at ent rm and rewire gr/1st floor except kitchen. raise door heights at interior doors by 6", replace interior doors, replace back door, back patio door, back powder room window , install new wood floors, skim walls and ceilings, paint,add new basebd | $30,000 |