Back to bathroom remodel contractors
Briody Construction
- Based in
- Daly City
- On San Francisco permits
- Oct 2008 to Jul 2011
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2011 | Never finaled issued Jul 2011, no final | 535 Laurel St | remodel gr fl, add full bath at ent rm and rewire gr/1st floor except kitchen. raise door heights at interior doors by 6", replace interior doors, replace back door, back patio door, back powder room window , install new wood floors, skim walls and ceilings, paint,add new basebdDetails
remodel gr fl, add full bath at ent rm and rewire gr/1st floor except kitchen. raise door heights at interior doors by 6", replace interior doors, replace back door, back patio door, back powder room window , install new wood floors, skim walls and ceilings, paint,add new basebd | $30,000 |
| Feb 17, 2011 | Completed final sign-off Feb 2011 | 2848 Sacramento St | revision to pa# 20100914-0837: add new ceiling joists to (e) joists. remodel 2 (e) bathroom. add insulation to ext. walls.Details
revision to pa# 20100914-0837: add new ceiling joists to (e) joists. remodel 2 (e) bathroom. add insulation to ext. walls. | $6,000 |
| Sep 14, 2010 | Completed final sign-off Feb 2011 | 2848 Sacramento St | reframe interiordoor replace with new doors & new caseings, install new tub, paint interior walls & wood work. replace doors and window casings, bath remodels.Details
reframe interiordoor replace with new doors & new caseings, install new tub, paint interior walls & wood work. replace doors and window casings, bath remodels. | $32,000 |
| Aug 24, 2009 | Completed final sign-off Dec 2009 | 52 Shore View Av | add bathroom, guest room, new furnaceDetails
add bathroom, guest room, new furnace | $10,000 |