Back to kitchen remodel contractors
Brinkerhoff Construction
- Based in
- Pleasant Hill
- On San Francisco permits
- Oct 2014 to Sep 2024
- Last 24 months
- 0 permits filed
16 permits since 2000: 11 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2024 | Completed final sign-off Feb 2025 | 1530 Mcallister St | unt 4: replacing kitchen cabinets, countertop and appliances (this work is different from the previous work on pa# 2023-0616-0285Details
unt 4: replacing kitchen cabinets, countertop and appliances (this work is different from the previous work on pa# 2023-0616-0285 | $30,000 |
| May 18, 2023 | Completed final sign-off Mar 2024 | 900 Bush St | unit 620 build a (n) partition wall separating the living room from a new bedroom; adding a swing door off the hallway for a new bedroom entrance; wing wall framing for a closet; kitchen - all new cabinets and stone tops. electrical outlets upgrade and under cabinet lighting with new appliancesDetails
unit 620 build a (n) partition wall separating the living room from a new bedroom; adding a swing door off the hallway for a new bedroom entrance; wing wall framing for a closet; kitchen - all new cabinets and stone tops. electrical outlets upgrade and under cabinet lighting with new appliances | $33,000 |
| Apr 18, 2022 | Completed final sign-off Oct 2022 | 1441 Jones St | apt 501: kitchen & bathroom remodel: update fixtures- no wall layout changes- update electrical receptacles & subpanel location.Details
apt 501: kitchen & bathroom remodel: update fixtures- no wall layout changes- update electrical receptacles & subpanel location. | $45,000 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 44 Yukon St | remove and replace floor and wall tile in unit 44 bathroom. remove and replace kitchen countertops in both units (44 & 46). remove and replace new stone fireplaces surroundings in both units (44 & 46)Details
remove and replace floor and wall tile in unit 44 bathroom. remove and replace kitchen countertops in both units (44 & 46). remove and replace new stone fireplaces surroundings in both units (44 & 46) | $22,700 |