Back to bathroom remodel contractors
Brinkerhoff Construction
- Based in
- Pleasant Hill
- On San Francisco permits
- Oct 2014 to Sep 2024
- Last 24 months
- 0 permits filed
16 permits since 2000: 11 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2022 | Completed final sign-off Oct 2022 | 1441 Jones St | apt 501: kitchen & bathroom remodel: update fixtures- no wall layout changes- update electrical receptacles & subpanel location.Details
apt 501: kitchen & bathroom remodel: update fixtures- no wall layout changes- update electrical receptacles & subpanel location. | $45,000 |
| Jan 26, 2022 | Completed final sign-off Jun 2022 | 900 Bush St | unit #1101: trim swap out tile floor and painting of bathroom. 1 bathroom remodel. exist toilet & tub remain.Details
unit #1101: trim swap out tile floor and painting of bathroom. 1 bathroom remodel. exist toilet & tub remain. | $5,500 |
| Sep 30, 2021 | Completed final sign-off Oct 2022 | 1626 21st Av | bathroom remodel: update fixtures. no wall layout changesDetails
bathroom remodel: update fixtures. no wall layout changes | $7,600 |
| Mar 10, 2021 | Completed final sign-off Aug 2021 | 900 Bush St | remove & replace existing flooring, replace bathroom vanity & faucet.new lenoleum flooring.Details
remove & replace existing flooring, replace bathroom vanity & faucet.new lenoleum flooring. | $20,000 |
| Mar 10, 2021 | Completed final sign-off Aug 2021 | 900 Bush St | remove & replace existing flooring, replace bathroom vanity & faucet.new lenoleum flooring.Details
remove & replace existing flooring, replace bathroom vanity & faucet.new lenoleum flooring. | $7,000 |
| May 31, 2019 | Completed final sign-off Jul 2021 | 706 Castro St | demolition of existing bathroom, general construction, tile work and shower enclosure and fixtures.Details
demolition of existing bathroom, general construction, tile work and shower enclosure and fixtures. | $51,248 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 44 Yukon St | remove and replace floor and wall tile in unit 44 bathroom. remove and replace kitchen countertops in both units (44 & 46). remove and replace new stone fireplaces surroundings in both units (44 & 46)Details
remove and replace floor and wall tile in unit 44 bathroom. remove and replace kitchen countertops in both units (44 & 46). remove and replace new stone fireplaces surroundings in both units (44 & 46) | $22,700 |