Back to kitchen remodel contractors
Brian Birney
- Based in
- San Francisco
- On San Francisco permits
- Aug 2018 to Apr 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 442 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2021 | Completed final sign-off Apr 2022 | 1364 Sacramento St | replace 6 e aluminum single pane windows. not street facing. wi new dble paine at existing openings. replace kinob and tube with new. remodel e bath and kitchen. repair dryrot in e deck w staircase. replace e gas wall furnace. ufactor .30 max approx 15%Details
replace 6 e aluminum single pane windows. not street facing. wi new dble paine at existing openings. replace kinob and tube with new. remodel e bath and kitchen. repair dryrot in e deck w staircase. replace e gas wall furnace. ufactor .30 max approx 15% | $45,000 |
| Aug 10, 2018 | Completed final sign-off Oct 2019 | 1362 Sacramento St | kitchen & bath remodel,l replace knob & tube w/newDetails
kitchen & bath remodel,l replace knob & tube w/new | $50,000 |