Back to kitchen remodel contractors
Brautovich Construction Inc.
- Based in
- Oakland
- On San Francisco permits
- Feb 2009 to Aug 2016
- Last 24 months
- 0 permits filed
28 permits since 2000: 26 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2016 | Completed final sign-off Jun 2017 | 2735 Clay St | unit #8. upgrade elelctrical wiring, plugs, switches, lights. remove & replace sub floor - insulate joist bays. acoustically upgrade one exterior wall - no structural work. install new crown mold. replace surface boards (e) ext deck. remove & replace (e) cab's at (e) kitchen, replace poly carb panelDetails
unit #8. upgrade elelctrical wiring, plugs, switches, lights. remove & replace sub floor - insulate joist bays. acoustically upgrade one exterior wall - no structural work. install new crown mold. replace surface boards (e) ext deck. remove & replace (e) cab's at (e) kitchen, replace poly carb panel | $45,000 |
| Sep 16, 2014 | Never finaled issued Sep 2014, no final | 60 Darrell Pl | remodel kitchen, upstairs bath, in kind. remove upstairs bedroom closet. insulation at ex walls only. no structural work or exterior workDetails
remodel kitchen, upstairs bath, in kind. remove upstairs bedroom closet. insulation at ex walls only. no structural work or exterior work | $35,000 |
| Jul 31, 2012 | Completed final sign-off Mar 2013 | 4376 24th St | remodel (e) kichen and bathroom. remove all finishes to the studs. 1st flr kitchen - replace in kind with new cabinets, counters, appliances flooring, cut pass through opening at (e) non-bearing partition. 2nd flr bathroom: remove tub and install shower, shower tile, floor, tile, fan, vanity, toiletDetails
remodel (e) kichen and bathroom. remove all finishes to the studs. 1st flr kitchen - replace in kind with new cabinets, counters, appliances flooring, cut pass through opening at (e) non-bearing partition. 2nd flr bathroom: remove tub and install shower, shower tile, floor, tile, fan, vanity, toilet | $38,000 |