Bradford Huang Contraction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Nov 2025
- Last 24 months
- 6 permits filed
38 permits since 2000: 31 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 208 days from filing to permit and 1143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2021 | Completed final sign-off Dec 2024 | 1906 Greenwich St | add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor.Details
add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor. | $280,000 |