Back to kitchen remodel contractors
Bradford Huang Contraction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Nov 2025
- Last 24 months
- 6 permits filed
38 permits since 2000: 31 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 1 never finaled, 2 expired or cancelled. Typically 3 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2025 | Completed final sign-off May 2026 | 32 Santa Fe Av | 1st fl - add 2 bedrooms, 2 full bathrooms, entertainment room, gym, a kitchenette (2 burner), and a tankless water heaterDetails
1st fl - add 2 bedrooms, 2 full bathrooms, entertainment room, gym, a kitchenette (2 burner), and a tankless water heater | $50,000 |
| Apr 3, 2025 | Completed final sign-off Sep 2025 | 1930 Silver Av | rev 202503202696: 2/f: minor change in kitchen layout per plan.Details
rev 202503202696: 2/f: minor change in kitchen layout per plan. | |
| Mar 20, 2025 | Completed final sign-off Sep 2025 | 1930 Silver Av | rev 202412237344: 2/f: add full bathroom, remodel kitchen - move walls, living and dining rooms, bathroom. 1/f: add 2 bedrooms, 2 bathrooms, bar, replace mech.Details
rev 202412237344: 2/f: add full bathroom, remodel kitchen - move walls, living and dining rooms, bathroom. 1/f: add 2 bedrooms, 2 bathrooms, bar, replace mech. | $140,000 |
| Dec 23, 2024 | Completed final sign-off Sep 2025 | 1930 Silver Av | remodel 1 kitchen and 1 bathroom in-kind on 2/f.Details
remodel 1 kitchen and 1 bathroom in-kind on 2/f. | $40,000 |
| Apr 15, 2022 | Completed final sign-off Sep 2023 | 517 Ulloa St | kitchen & bathroom remodel on 2nd fl (replace in kind, no change in layout). decay repair as in kind and destructive test/ sheetrock removal to expose decay (no struc. work). no exterior work.Details
kitchen & bathroom remodel on 2nd fl (replace in kind, no change in layout). decay repair as in kind and destructive test/ sheetrock removal to expose decay (no struc. work). no exterior work. | $20,000 |
| Nov 20, 2019 | Never finaled issued Nov 2019, no final | 1906 Greenwich St | kitchen remodel. (1) bathroom remodel,decay repari as in kind on first floor. front windows to be wood with original dry rot removed inside.Details
kitchen remodel. (1) bathroom remodel,decay repari as in kind on first floor. front windows to be wood with original dry rot removed inside. | |
| Feb 5, 2019 | Expired or cancelled expired Mar 2022 | 2074 Bancroft Av | per unit legalization ord# 43-14, legalize of dwelling unit installed w/o permit. comply w/ nov# 201804991 and 201890208. 1st flr: kitchen, living room, 1 full bath and 1 bedroom.Details
per unit legalization ord# 43-14, legalize of dwelling unit installed w/o permit. comply w/ nov# 201804991 and 201890208. 1st flr: kitchen, living room, 1 full bath and 1 bedroom. | $60,000 |
| Mar 7, 2018 | Completed final sign-off Mar 2020 | 28 Waterville St | new bathroom and partition wall on 2nd fl. remodel kitchen. gr fl rooms to be legalized on separate permit, no work gr fl. structural upgrade on 1/fDetails
new bathroom and partition wall on 2nd fl. remodel kitchen. gr fl rooms to be legalized on separate permit, no work gr fl. structural upgrade on 1/f | $25,000 |
| Sep 9, 2016 | Completed final sign-off Jan 2018 | 88 Valparaiso St | legalize unit per no.43-14 legalize kitchen, bathroom (2) bedroom and living room on first floor. sprinkler under separate permit.Details
legalize unit per no.43-14 legalize kitchen, bathroom (2) bedroom and living room on first floor. sprinkler under separate permit. | $20,000 |
| Jun 29, 2016 | Expired or cancelled cancelled Nov 2016 | 207 Brussels St | change tile in the kitchen, change hard wood floor in the main floor and change cabinetDetails
change tile in the kitchen, change hard wood floor in the main floor and change cabinet | $21,501 |