Back to kitchen remodel contractors
Bradford Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Aug 2026
- Last 24 months
- 11 permits filed
183 permits since 2000: 114 completed, 7 in progress, 21 never finaled, 41 expired or cancelled.
Of the 21 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
38 kitchen remodel permits: 24 completed, 1 in progress, 3 never finaled, 10 expired or cancelled. Typically 19 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2026 | Completed final sign-off Aug 2026 | 22 Beaver St | rear structure (carriage house) new roofing, in-kind skylight replacement @ the existing locations, removal of window, 1 replacement window to be installed in the same location; replacement @ existing locations of appliances in kitchen. bathroom remodel. all work occurs @ the carriage house.Details
rear structure (carriage house) new roofing, in-kind skylight replacement @ the existing locations, removal of window, 1 replacement window to be installed in the same location; replacement @ existing locations of appliances in kitchen. bathroom remodel. all work occurs @ the carriage house. | $25,000 |
| Feb 28, 2025 | Completed final sign-off Dec 2025 | 1908 Broadway | entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft.Details
entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft. | $210,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 650 Delancey St | unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes.Details
unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes. | $120,000 |
| Jul 1, 2022 | Completed final sign-off Oct 2023 | 3235 Webster St | infill at existing central court to enlarge kitchen. project includes kitchen, bath, powder room, and interior stair remodel.Details
infill at existing central court to enlarge kitchen. project includes kitchen, bath, powder room, and interior stair remodel. | $148,604 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 930 Ashbury St | voluntary seismic improvement at basement. new bedroom and multipurpose space at basement, add/enlarge and replace windows, replace gargae doors, add full baths to basement and 2nd fl. update kitchen on 1st fl.Details
voluntary seismic improvement at basement. new bedroom and multipurpose space at basement, add/enlarge and replace windows, replace gargae doors, add full baths to basement and 2nd fl. update kitchen on 1st fl. | $150,000 |
| Oct 15, 2019 | Expired or cancelled cancelled Jun 2021 | 2766 39th Av | horizontal rear yard addition on 2 levels, (n) slab foundation w/ partial excavation & retaining walls. demolition of (e) bathroom and kitchen. (n) kitchen, (2) bathrooms and (1) half-bath.Details
horizontal rear yard addition on 2 levels, (n) slab foundation w/ partial excavation & retaining walls. demolition of (e) bathroom and kitchen. (n) kitchen, (2) bathrooms and (1) half-bath. | $500,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2020 | 661 Alvarado St | (e) cabinetry & fixtures in all kitchens & bathrooms to be replaced. interior wall removal & garage to be leveled. ext work replace (e) roof and int'l shearwall & add a (n) operable skylight. (e) garage door to be enlarged, install (n) sliding door @ 2nd fl bedrm, (n) door and wood deck @ rear ofDetails
(e) cabinetry & fixtures in all kitchens & bathrooms to be replaced. interior wall removal & garage to be leveled. ext work replace (e) roof and int'l shearwall & add a (n) operable skylight. (e) garage door to be enlarged, install (n) sliding door @ 2nd fl bedrm, (n) door and wood deck @ rear of | $250,000 |
| Mar 15, 2017 | Completed final sign-off Oct 2019 | 1660 Shrader St | remodel of a sfd which includes replace the (e) sloping roof above the living & dining rooms @ the 4th floor roof with a new flat roof with the ceiling aligned @ the original high point. a kitchen remodl. replace a fire place. addition of new deck in the 4th floor. new sliding doors& replace windowsDetails
remodel of a sfd which includes replace the (e) sloping roof above the living & dining rooms @ the 4th floor roof with a new flat roof with the ceiling aligned @ the original high point. a kitchen remodl. replace a fire place. addition of new deck in the 4th floor. new sliding doors& replace windows | $147,278 |
| Jan 7, 2015 | Completed final sign-off Mar 2015 | 413 10th St | repair due to upgrade on an extg commercial kitchen. sheetrock repairs due to plumbing and electrical. concrete patching due to new underground plumbing with one hour ceiling in kitchen.Details
repair due to upgrade on an extg commercial kitchen. sheetrock repairs due to plumbing and electrical. concrete patching due to new underground plumbing with one hour ceiling in kitchen. | $30,000 |
| Feb 12, 2014 | Completed final sign-off Oct 2014 | 2606 16th Av | project proposes a removal and infill of an extg courtyard and an interior remodel of a extg kitchen, extg dining, extg bathroom and new powder room. comply with sf green building code table 4. install kitchen hood & two (2) bathroom fans.Details
project proposes a removal and infill of an extg courtyard and an interior remodel of a extg kitchen, extg dining, extg bathroom and new powder room. comply with sf green building code table 4. install kitchen hood & two (2) bathroom fans. | $90,576 |
| Dec 30, 2013 | Completed final sign-off Apr 2014 | 311 Valley St | project proposes interior remodel of extg kitchen and extg bathroom at 2nd floor. scope of work includes finishes, cabinetry, plmg, and lighting fixtures. new replacement windows at side. mech, electrical, plmg under seperate permit.Details
project proposes interior remodel of extg kitchen and extg bathroom at 2nd floor. scope of work includes finishes, cabinetry, plmg, and lighting fixtures. new replacement windows at side. mech, electrical, plmg under seperate permit. | $18,277 |
| Sep 30, 2013 | Completed final sign-off Feb 2014 | 985 Clayton St | remodel kitchen including widening of opening between kitchen & dining room on 2nd floor. add ~kf21&bath on 3rd floor.Details
remodel kitchen including widening of opening between kitchen & dining room on 2nd floor. add ~kf21&bath on 3rd floor. | $36,500 |
| Aug 9, 2013 | Completed final sign-off Jul 2015 | 18 Whitney St | horiz. rear yard addition on 3 levels, with renovations to (e) bldg add 2 bathrms, remodel 1 bathrm, relocate 1/2 bath. rear yard deck and stairs, add 2 bedrms, new kitchenDetails
horiz. rear yard addition on 3 levels, with renovations to (e) bldg add 2 bathrms, remodel 1 bathrm, relocate 1/2 bath. rear yard deck and stairs, add 2 bedrms, new kitchen | $370,000 |
| Dec 24, 2012 | Completed final sign-off Aug 2017 | 344 Linden St | change of use from b-laundry to b-occupancy restaurant & minor alterations including (n) flooring wall finishes & kitchen equip. no change to existing. no structural work, under this permit.Details
change of use from b-laundry to b-occupancy restaurant & minor alterations including (n) flooring wall finishes & kitchen equip. no change to existing. no structural work, under this permit. | $27,000 |
| Sep 27, 2012 | Completed final sign-off Jun 2013 | 2617 Sutter St | remove & replace (e) kitchen cabinets and countertops with new. add one dishwasher and microwave, sheetrock & paint.Details
remove & replace (e) kitchen cabinets and countertops with new. add one dishwasher and microwave, sheetrock & paint. | $12,500 |
| Aug 30, 2012 | Completed final sign-off Dec 2012 | 75 Deming St | renovate 2 bathrooms, partial kitchens, living room, dining room. scope of work includes new finishes, cabinetry, plumbing, light fixturesDetails
renovate 2 bathrooms, partial kitchens, living room, dining room. scope of work includes new finishes, cabinetry, plumbing, light fixtures | $105,000 |
| Dec 29, 2011 | Never finaled issued Jan 2012, no final | 903 Cortland Av | replace existing exhaust hood in an existing commercial kitchenDetails
replace existing exhaust hood in an existing commercial kitchen | $7,500 |
| Aug 22, 2011 | Completed final sign-off Aug 2011 | 3141 16th St | to comply with nov #2009-94080- remove commercial kitchen hood, installed without the benefit of permit, hood to be removed & wall to be repaired.Details
to comply with nov #2009-94080- remove commercial kitchen hood, installed without the benefit of permit, hood to be removed & wall to be repaired. | $1,200 |
| Jul 18, 2011 | Completed final sign-off Aug 2011 | 3141 16th St | remove commercial kitchen hood per nov# 200994080, install without benefit of permit, hood to be removal & wall to be repaired.Details
remove commercial kitchen hood per nov# 200994080, install without benefit of permit, hood to be removal & wall to be repaired. | $1,200 |
| Mar 8, 2011 | Completed final sign-off Nov 2011 | 1200 California St | renovation of extg kitchen and extg bathrooms.Details
renovation of extg kitchen and extg bathrooms. | $85,000 |
| Dec 21, 2010 | Expired or cancelled cancelled Jan 2026 | 338 Spear St | interior renovation of (1) kitchen and (2) bathrooms. no structural work.Details
interior renovation of (1) kitchen and (2) bathrooms. no structural work. | $175,000 |
| Sep 22, 2010 | Completed final sign-off Dec 2010 | 3317 Steiner St | interior ti to (e) restaurant. new owner : chotto japanese restaurant. work includes (n) remodel ada restrooms, (n) bar counter, (n) elect and plbg as req'd., kitchen equip. set upDetails
interior ti to (e) restaurant. new owner : chotto japanese restaurant. work includes (n) remodel ada restrooms, (n) bar counter, (n) elect and plbg as req'd., kitchen equip. set up | $58,000 |
| Mar 1, 2010 | Completed final sign-off Dec 2010 | 2046 Beach St | built out of (e) storage area behind garage into master suite, playroom, office, laundry and full bathroom. renovation of existing kitchen and bathrooms on upper level. addition of 3 skylights.Details
built out of (e) storage area behind garage into master suite, playroom, office, laundry and full bathroom. renovation of existing kitchen and bathrooms on upper level. addition of 3 skylights. | $165,000 |
| Aug 26, 2009 | Expired or cancelled expired Sep 2012 | 833 Cortland Av | tenant improvement to include ada upgrades to front doors, new countertops and display area, (change of use). kitchen/structural done under permit #2008/0429/0872.Details
tenant improvement to include ada upgrades to front doors, new countertops and display area, (change of use). kitchen/structural done under permit #2008/0429/0872. | $20,000 |
| May 28, 2009 | Expired or cancelled expired Nov 2012 | 38 Digby St | complete interior renovation including kitchen and baths. replace all existing windows and doors. seismic retrofit. replace e decks. new windows and skylights.Details
complete interior renovation including kitchen and baths. replace all existing windows and doors. seismic retrofit. replace e decks. new windows and skylights. | $400,000 |
| Mar 13, 2009 | Completed final sign-off May 2011 | 764 Ulloa St | horizontal addition to 3rd floor-add 2 bedrooms, 1 bathroom & laundry. remodel master bathroom, kitchen & family room. add deck & stairs to rear yard. add 1 bathroom & remodel 1 bathroom to 2nd floor.Details
horizontal addition to 3rd floor-add 2 bedrooms, 1 bathroom & laundry. remodel master bathroom, kitchen & family room. add deck & stairs to rear yard. add 1 bathroom & remodel 1 bathroom to 2nd floor. | $180,000 |
| Dec 28, 2007 | Completed final sign-off Sep 2009 | 1703 Octavia St | site plan. enclose existing porch to create a new bathroom. alteration of kitchen and new connecting stair.Details
site plan. enclose existing porch to create a new bathroom. alteration of kitchen and new connecting stair. | $90,000 |
| Oct 24, 2007 | Expired or cancelled expired Jul 2010 | 833 Cortland Av | removal of illegal kitchen/bath at street level.Details
removal of illegal kitchen/bath at street level. | $5,000 |
| Mar 12, 2007 | Expired or cancelled expired Jul 2008 | 2 Prospect Av | remove & replace kitchen cabinets, dryrot repair on (e) deck, remove 2 structural walls, 1 in each unit. remodel 1 bathroom, install plywood at north-east side of ext. wall, new sheetrock and interior doors.Details
remove & replace kitchen cabinets, dryrot repair on (e) deck, remove 2 structural walls, 1 in each unit. remodel 1 bathroom, install plywood at north-east side of ext. wall, new sheetrock and interior doors. | $35,000 |
| Mar 2, 2007 | Completed final sign-off Apr 2008 | 1363 15th Av | remove (e) rear porch at 1st floor & crawlspace levels. remove (e) kitchen, w.c., & separate int. & ext. demo. add new 1st floor kitchen & new int. partitions for new bath, workroom, mech. closet & laundry spaces.Details
remove (e) rear porch at 1st floor & crawlspace levels. remove (e) kitchen, w.c., & separate int. & ext. demo. add new 1st floor kitchen & new int. partitions for new bath, workroom, mech. closet & laundry spaces. | $202,000 |
| Aug 21, 2006 | Never finaled issued Sep 2006, no final | 25 Carmel St | rev appl #200505122294. provide one hour fire resistive translucsent wall assembly at kitchen. provide 45 min. fire resistive protectied opening at second floor bedroom and at stair landikng.Details
rev appl #200505122294. provide one hour fire resistive translucsent wall assembly at kitchen. provide 45 min. fire resistive protectied opening at second floor bedroom and at stair landikng. | $5,000 |
| Jan 31, 2006 | Expired or cancelled expired Mar 2008 | 534 04th Av | build bedroom, bathroom with stair at (e) g/f, kitchen, bath @ 2/f. underpin (e) footings, garage girder, seismic reinforcement.Details
build bedroom, bathroom with stair at (e) g/f, kitchen, bath @ 2/f. underpin (e) footings, garage girder, seismic reinforcement. | $100,000 |
| Jan 26, 2006 | Expired or cancelled expired Jul 2008 | 2 Prospect Av | remodel (e) kitchen + bathroom. remove + replace all sheetrock/lath plaster. (1) exterior door (thrbshold). no structural work.Details
remodel (e) kitchen + bathroom. remove + replace all sheetrock/lath plaster. (1) exterior door (thrbshold). no structural work. | $20,000 |
| Nov 15, 2005 | Completed final sign-off Mar 2008 | 534 04th Av | conversion of existing first floor storage space to bedroom suite, horizontal addition including bedroom and breakfast room new kitchen, seismic improvementDetails
conversion of existing first floor storage space to bedroom suite, horizontal addition including bedroom and breakfast room new kitchen, seismic improvement | $175,000 |
| Jun 21, 2005 | Completed final sign-off Sep 2005 | 3720 Cesar Chavez St | renew appl#200307250382,200307159494 kitchen & bath remodel and revisionDetails
renew appl#200307250382,200307159494 kitchen & bath remodel and revision | |
| Apr 8, 2005 | Expired or cancelled expired Dec 2009 | 566 28th St | horizontal addition at second floor, over the garage. bathroom addition at both levels. kitchen remodel.Details
horizontal addition at second floor, over the garage. bathroom addition at both levels. kitchen remodel. | $100,000 |
| May 12, 2004 | Expired or cancelled expired Jun 2009 | 3718 Cesar Chavez St | remove & replace kitchen cabinetss, repair minor dryrot throughout unit, install half bath (toilet/sDetails
remove & replace kitchen cabinetss, repair minor dryrot throughout unit, install half bath (toilet/s | $20,000 |
| Jan 8, 2004 | Completed final sign-off May 2004 | 942 Treat Av | comply w/ condo conversion app#3r-3836. remodel (2)kitchens & (2) bathrooms.Details
comply w/ condo conversion app#3r-3836. remodel (2)kitchens & (2) bathrooms. | $30,000 |