Back to bathroom remodel contractors
Bradford Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Aug 2026
- Last 24 months
- 11 permits filed
183 permits since 2000: 114 completed, 7 in progress, 21 never finaled, 41 expired or cancelled.
Of the 21 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
44 bathroom remodel permits: 25 completed, 1 in progress, 4 never finaled, 14 expired or cancelled. Typically 12 days from filing to permit and 265 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2026 | Completed final sign-off Aug 2026 | 22 Beaver St | rear structure (carriage house) new roofing, in-kind skylight replacement @ the existing locations, removal of window, 1 replacement window to be installed in the same location; replacement @ existing locations of appliances in kitchen. bathroom remodel. all work occurs @ the carriage house.Details
rear structure (carriage house) new roofing, in-kind skylight replacement @ the existing locations, removal of window, 1 replacement window to be installed in the same location; replacement @ existing locations of appliances in kitchen. bathroom remodel. all work occurs @ the carriage house. | $25,000 |
| Feb 28, 2025 | Completed final sign-off Dec 2025 | 1908 Broadway | entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft.Details
entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft. | $210,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 650 Delancey St | unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes.Details
unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes. | $120,000 |
| Jul 1, 2022 | Completed final sign-off Oct 2023 | 3235 Webster St | infill at existing central court to enlarge kitchen. project includes kitchen, bath, powder room, and interior stair remodel.Details
infill at existing central court to enlarge kitchen. project includes kitchen, bath, powder room, and interior stair remodel. | $148,604 |
| Dec 5, 2019 | Expired or cancelled cancelled Jan 2020 | 1515 16th Av | remodel of 2 (e) bathroom. upstairs bathroom: remodel bathroom - new fixtures; convert (e) shower to tub in same location. remodel downstairs bathroom in-kind. no walls modified or altered. layout remains unchanged.Details
remodel of 2 (e) bathroom. upstairs bathroom: remodel bathroom - new fixtures; convert (e) shower to tub in same location. remodel downstairs bathroom in-kind. no walls modified or altered. layout remains unchanged. | $32,500 |
| Nov 1, 2019 | Completed final sign-off Sep 2020 | 147 04th Av | foyer, bedroom , and living area at 1st fl. add windows to 1st fl. add full bathroom to 1st fl. add 1 hr rating at garage, new deck to replace existingDetails
foyer, bedroom , and living area at 1st fl. add windows to 1st fl. add full bathroom to 1st fl. add 1 hr rating at garage, new deck to replace existing | $122,000 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 930 Ashbury St | voluntary seismic improvement at basement. new bedroom and multipurpose space at basement, add/enlarge and replace windows, replace gargae doors, add full baths to basement and 2nd fl. update kitchen on 1st fl.Details
voluntary seismic improvement at basement. new bedroom and multipurpose space at basement, add/enlarge and replace windows, replace gargae doors, add full baths to basement and 2nd fl. update kitchen on 1st fl. | $150,000 |
| Oct 15, 2019 | Expired or cancelled cancelled Jun 2021 | 2766 39th Av | horizontal rear yard addition on 2 levels, (n) slab foundation w/ partial excavation & retaining walls. demolition of (e) bathroom and kitchen. (n) kitchen, (2) bathrooms and (1) half-bath.Details
horizontal rear yard addition on 2 levels, (n) slab foundation w/ partial excavation & retaining walls. demolition of (e) bathroom and kitchen. (n) kitchen, (2) bathrooms and (1) half-bath. | $500,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2020 | 661 Alvarado St | (e) cabinetry & fixtures in all kitchens & bathrooms to be replaced. interior wall removal & garage to be leveled. ext work replace (e) roof and int'l shearwall & add a (n) operable skylight. (e) garage door to be enlarged, install (n) sliding door @ 2nd fl bedrm, (n) door and wood deck @ rear ofDetails
(e) cabinetry & fixtures in all kitchens & bathrooms to be replaced. interior wall removal & garage to be leveled. ext work replace (e) roof and int'l shearwall & add a (n) operable skylight. (e) garage door to be enlarged, install (n) sliding door @ 2nd fl bedrm, (n) door and wood deck @ rear of | $250,000 |
| Oct 31, 2017 | Never finaled issued Jun 2021, no final | 1915 Diamond St | renovate (e) 2 unit residential building including new rear deck & new 4th floor over 9e) 3 story building. 3 new bedrooms & 2 new bathrooms.Details
renovate (e) 2 unit residential building including new rear deck & new 4th floor over 9e) 3 story building. 3 new bedrooms & 2 new bathrooms. | $545,828 |
| Jan 12, 2017 | Completed final sign-off Oct 2019 | 1660 Shrader St | interior remodel of single family residence which includes 1/2 bath 1st fl, new master bdrm, closet, 2 new baths, guest bdrm, lunday 2nd fl,pwder rm, storage, wetbar 3rd fl,new interior stairs, new exterior stairs at rear. no work in frontDetails
interior remodel of single family residence which includes 1/2 bath 1st fl, new master bdrm, closet, 2 new baths, guest bdrm, lunday 2nd fl,pwder rm, storage, wetbar 3rd fl,new interior stairs, new exterior stairs at rear. no work in front | $521,983 |
| May 6, 2016 | Completed final sign-off Oct 2019 | 1142 Alabama St | horizontal expansion & interior renovation @ all 3 floors w/ (n) plumbing, electrical & mechanical work. 4 total bedrooms, 4 total bathrooms, 2 each per condo.Details
horizontal expansion & interior renovation @ all 3 floors w/ (n) plumbing, electrical & mechanical work. 4 total bedrooms, 4 total bathrooms, 2 each per condo. | $275,340 |
| Sep 5, 2014 | Completed final sign-off Oct 2024 | 534 04th Av | replace (e) deteriorated front stair w/new stair. replace roof @ rear portion of house - add 2 bedrooms & 1 bath in former attic area.Details
replace (e) deteriorated front stair w/new stair. replace roof @ rear portion of house - add 2 bedrooms & 1 bath in former attic area. | $75,000 |
| Feb 12, 2014 | Completed final sign-off Oct 2014 | 2606 16th Av | project proposes a removal and infill of an extg courtyard and an interior remodel of a extg kitchen, extg dining, extg bathroom and new powder room. comply with sf green building code table 4. install kitchen hood & two (2) bathroom fans.Details
project proposes a removal and infill of an extg courtyard and an interior remodel of a extg kitchen, extg dining, extg bathroom and new powder room. comply with sf green building code table 4. install kitchen hood & two (2) bathroom fans. | $90,576 |
| Dec 30, 2013 | Completed final sign-off Apr 2014 | 311 Valley St | project proposes interior remodel of extg kitchen and extg bathroom at 2nd floor. scope of work includes finishes, cabinetry, plmg, and lighting fixtures. new replacement windows at side. mech, electrical, plmg under seperate permit.Details
project proposes interior remodel of extg kitchen and extg bathroom at 2nd floor. scope of work includes finishes, cabinetry, plmg, and lighting fixtures. new replacement windows at side. mech, electrical, plmg under seperate permit. | $18,277 |
| Nov 26, 2013 | Completed final sign-off Jul 2016 | 104 Retiro Wy | 4th fl vertical addition (master bdrm, master bath, closets); stair penthouse to (n) roof terrace; rear yard conversion of part of ground fl to habitable den, bath & laundry; remodel 3rd fl bath. ** maher: compliance with ordinance no# 155-13 not required **Details
4th fl vertical addition (master bdrm, master bath, closets); stair penthouse to (n) roof terrace; rear yard conversion of part of ground fl to habitable den, bath & laundry; remodel 3rd fl bath. ** maher: compliance with ordinance no# 155-13 not required ** | $346,000 |
| Sep 30, 2013 | Completed final sign-off Feb 2014 | 985 Clayton St | remodel kitchen including widening of opening between kitchen & dining room on 2nd floor. add ~kf21&bath on 3rd floor.Details
remodel kitchen including widening of opening between kitchen & dining room on 2nd floor. add ~kf21&bath on 3rd floor. | $36,500 |
| Aug 9, 2013 | Completed final sign-off Jul 2015 | 18 Whitney St | horiz. rear yard addition on 3 levels, with renovations to (e) bldg add 2 bathrms, remodel 1 bathrm, relocate 1/2 bath. rear yard deck and stairs, add 2 bedrms, new kitchenDetails
horiz. rear yard addition on 3 levels, with renovations to (e) bldg add 2 bathrms, remodel 1 bathrm, relocate 1/2 bath. rear yard deck and stairs, add 2 bedrms, new kitchen | $370,000 |
| Aug 30, 2012 | Completed final sign-off Dec 2012 | 75 Deming St | renovate 2 bathrooms, partial kitchens, living room, dining room. scope of work includes new finishes, cabinetry, plumbing, light fixturesDetails
renovate 2 bathrooms, partial kitchens, living room, dining room. scope of work includes new finishes, cabinetry, plumbing, light fixtures | $105,000 |
| Aug 8, 2012 | Completed final sign-off Jan 2013 | 49 Elk St | remodel exisitng bathrooms, add 1 shower enclosure, 2 new lights, new tile and sheetrockDetails
remodel exisitng bathrooms, add 1 shower enclosure, 2 new lights, new tile and sheetrock | $15,500 |
| May 24, 2011 | Never finaled issued May 2011, no final | 2714 Fulton St | renovate existing bathroom, new plumbing/electrical on 2nd floor onlyDetails
renovate existing bathroom, new plumbing/electrical on 2nd floor only | $11,300 |
| Apr 7, 2011 | Expired or cancelled cancelled Jul 2014 | 835 Cortland Av | comply with nov 201080466. legalize vertical additon at rear 2nd fl. deck: endlosed 40% of deck with walls and roof. install new half bath at rear bedroom. not part of novDetails
comply with nov 201080466. legalize vertical additon at rear 2nd fl. deck: endlosed 40% of deck with walls and roof. install new half bath at rear bedroom. not part of nov | $3,000 |
| Mar 8, 2011 | Completed final sign-off Nov 2011 | 1200 California St | renovation of extg kitchen and extg bathrooms.Details
renovation of extg kitchen and extg bathrooms. | $85,000 |
| Dec 21, 2010 | Expired or cancelled cancelled Jan 2026 | 338 Spear St | interior renovation of (1) kitchen and (2) bathrooms. no structural work.Details
interior renovation of (1) kitchen and (2) bathrooms. no structural work. | $175,000 |
| Mar 1, 2010 | Completed final sign-off Dec 2010 | 2046 Beach St | built out of (e) storage area behind garage into master suite, playroom, office, laundry and full bathroom. renovation of existing kitchen and bathrooms on upper level. addition of 3 skylights.Details
built out of (e) storage area behind garage into master suite, playroom, office, laundry and full bathroom. renovation of existing kitchen and bathrooms on upper level. addition of 3 skylights. | $165,000 |
| May 28, 2009 | Expired or cancelled expired Nov 2012 | 38 Digby St | complete interior renovation including kitchen and baths. replace all existing windows and doors. seismic retrofit. replace e decks. new windows and skylights.Details
complete interior renovation including kitchen and baths. replace all existing windows and doors. seismic retrofit. replace e decks. new windows and skylights. | $400,000 |
| Mar 13, 2009 | Completed final sign-off May 2011 | 764 Ulloa St | horizontal addition to 3rd floor-add 2 bedrooms, 1 bathroom & laundry. remodel master bathroom, kitchen & family room. add deck & stairs to rear yard. add 1 bathroom & remodel 1 bathroom to 2nd floor.Details
horizontal addition to 3rd floor-add 2 bedrooms, 1 bathroom & laundry. remodel master bathroom, kitchen & family room. add deck & stairs to rear yard. add 1 bathroom & remodel 1 bathroom to 2nd floor. | $180,000 |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 34 Elsie St | construct new room & bathroom (w/structural upgrades) at rear, new entry door at ground floor. create opening in (e) wall & remove (e) entry door at top of stairways on second floor.Details
construct new room & bathroom (w/structural upgrades) at rear, new entry door at ground floor. create opening in (e) wall & remove (e) entry door at top of stairways on second floor. | $32,000 |
| Dec 28, 2007 | Completed final sign-off Sep 2009 | 1703 Octavia St | site plan. enclose existing porch to create a new bathroom. alteration of kitchen and new connecting stair.Details
site plan. enclose existing porch to create a new bathroom. alteration of kitchen and new connecting stair. | $90,000 |
| Oct 24, 2007 | Expired or cancelled expired Jul 2010 | 833 Cortland Av | removal of illegal kitchen/bath at street level.Details
removal of illegal kitchen/bath at street level. | $5,000 |
| Mar 12, 2007 | Expired or cancelled expired Jul 2008 | 2 Prospect Av | remove & replace kitchen cabinets, dryrot repair on (e) deck, remove 2 structural walls, 1 in each unit. remodel 1 bathroom, install plywood at north-east side of ext. wall, new sheetrock and interior doors.Details
remove & replace kitchen cabinets, dryrot repair on (e) deck, remove 2 structural walls, 1 in each unit. remodel 1 bathroom, install plywood at north-east side of ext. wall, new sheetrock and interior doors. | $35,000 |
| Mar 2, 2007 | Completed final sign-off Apr 2008 | 1363 15th Av | remove (e) rear porch at 1st floor & crawlspace levels. remove (e) kitchen, w.c., & separate int. & ext. demo. add new 1st floor kitchen & new int. partitions for new bath, workroom, mech. closet & laundry spaces.Details
remove (e) rear porch at 1st floor & crawlspace levels. remove (e) kitchen, w.c., & separate int. & ext. demo. add new 1st floor kitchen & new int. partitions for new bath, workroom, mech. closet & laundry spaces. | $202,000 |
| Feb 23, 2006 | Never finaled issued Apr 2006, no final | 25 Carmel St | revision to pa# 2005/05/12/2294. additional scope at basement. foundation and retaining work to create habitable space. ( den and 1/2 bath) and create additional storage next to garage.Details
revision to pa# 2005/05/12/2294. additional scope at basement. foundation and retaining work to create habitable space. ( den and 1/2 bath) and create additional storage next to garage. | $70,000 |
| Feb 3, 2006 | Completed final sign-off Sep 2006 | 1518 09th Av | rev. to pa#2004/12/01/0486 - reducing scope of work: upper floor to remain as is, change g/f bathroom layout, change garage slab with new concreteDetails
rev. to pa#2004/12/01/0486 - reducing scope of work: upper floor to remain as is, change g/f bathroom layout, change garage slab with new concrete | |
| Jan 31, 2006 | Expired or cancelled expired Mar 2008 | 534 04th Av | build bedroom, bathroom with stair at (e) g/f, kitchen, bath @ 2/f. underpin (e) footings, garage girder, seismic reinforcement.Details
build bedroom, bathroom with stair at (e) g/f, kitchen, bath @ 2/f. underpin (e) footings, garage girder, seismic reinforcement. | $100,000 |
| Jan 26, 2006 | Expired or cancelled expired Jul 2008 | 2 Prospect Av | remodel (e) kitchen + bathroom. remove + replace all sheetrock/lath plaster. (1) exterior door (thrbshold). no structural work.Details
remodel (e) kitchen + bathroom. remove + replace all sheetrock/lath plaster. (1) exterior door (thrbshold). no structural work. | $20,000 |
| Nov 17, 2005 | Expired or cancelled expired Sep 2007 | 59 Hazelwood Av | voluntary foundation upgrade wseismic upgrades per structural drawingsframe interior walls and stairwell on 1st fl per plans. remove and redesign exterior doors and window per plans on 1st flr. bathroom addition only. sheetrock, finish and trim 1st fl space per architecural plans.Details
voluntary foundation upgrade wseismic upgrades per structural drawingsframe interior walls and stairwell on 1st fl per plans. remove and redesign exterior doors and window per plans on 1st flr. bathroom addition only. sheetrock, finish and trim 1st fl space per architecural plans. | $95,000 |
| Oct 24, 2005 | Expired or cancelled expired Mar 2007 | 275 Shipley St | close in 2 lightwells. interior remodel to accomodate 3 bedrooms & 2 baths.Details
close in 2 lightwells. interior remodel to accomodate 3 bedrooms & 2 baths. | $69,800 |
| Jun 21, 2005 | Completed final sign-off Sep 2005 | 3720 Cesar Chavez St | renew appl#200307250382,200307159494 kitchen & bath remodel and revisionDetails
renew appl#200307250382,200307159494 kitchen & bath remodel and revision | |
| Apr 8, 2005 | Expired or cancelled expired Dec 2009 | 566 28th St | horizontal addition at second floor, over the garage. bathroom addition at both levels. kitchen remodel.Details
horizontal addition at second floor, over the garage. bathroom addition at both levels. kitchen remodel. | $100,000 |
| Apr 8, 2005 | Completed final sign-off Jun 2005 | 242 Bocana St | remodel existing bath, new shower, vanity, toilet. install n sheetrock, no structural or framing chaDetails
remodel existing bath, new shower, vanity, toilet. install n sheetrock, no structural or framing cha | $10,000 |
| May 12, 2004 | Expired or cancelled expired Jun 2009 | 3718 Cesar Chavez St | remove & replace kitchen cabinetss, repair minor dryrot throughout unit, install half bath (toilet/sDetails
remove & replace kitchen cabinetss, repair minor dryrot throughout unit, install half bath (toilet/s | $20,000 |
| Jan 8, 2004 | Completed final sign-off May 2004 | 942 Treat Av | comply w/ condo conversion app#3r-3836. remodel (2)kitchens & (2) bathrooms.Details
comply w/ condo conversion app#3r-3836. remodel (2)kitchens & (2) bathrooms. | $30,000 |
| Nov 6, 2003 | Expired or cancelled expired Jun 2009 | 3724 Cesar Chavez St | remove/replace 2(e) window w/like size.repair dry rot on interior bath walls.frame in new laundryDetails
remove/replace 2(e) window w/like size.repair dry rot on interior bath walls.frame in new laundry | $15,000 |