Brad Lord Solutions
- Based in
- Berkeley
- On San Francisco permits
- Mar 2011 to Mar 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 108 days from filing to permit and 331 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2011 | Completed final sign-off Jun 2013 | 217 Douglass St | 320 sq. ft. rear yard addition with deck above to replace (e) deck & stairs. 198 sq. ft. 2nd floor addition. interior remodel with new interior stairs.Details
320 sq. ft. rear yard addition with deck above to replace (e) deck & stairs. 198 sq. ft. 2nd floor addition. interior remodel with new interior stairs. | $185,000 |
| Mar 10, 2011 | Completed final sign-off Oct 2011 | 241 Jersey St | repair and replace extg exterior stairs and adjacent exterior wall surfaces. new exterior garage door, exterior door and window in kind replacement.Details
repair and replace extg exterior stairs and adjacent exterior wall surfaces. new exterior garage door, exterior door and window in kind replacement. | $11,500 |