Brad Lord Solutions
- Based in
- Berkeley
- On San Francisco permits
- Mar 2011 to Mar 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 243 Jersey St | partial replacement of decking @ existing rear deck (less than50%)Details
partial replacement of decking @ existing rear deck (less than50%) | $3,500 |
| Feb 28, 2013 | Completed final sign-off Jun 2013 | 217 Douglass St | revision to pa#2011-08-24-3148. add wood deck material options to include 2x6 redwood & 2x6 cedar.Details
revision to pa#2011-08-24-3148. add wood deck material options to include 2x6 redwood & 2x6 cedar. | |
| Aug 24, 2011 | Completed final sign-off Jun 2013 | 217 Douglass St | 320 sq. ft. rear yard addition with deck above to replace (e) deck & stairs. 198 sq. ft. 2nd floor addition. interior remodel with new interior stairs.Details
320 sq. ft. rear yard addition with deck above to replace (e) deck & stairs. 198 sq. ft. 2nd floor addition. interior remodel with new interior stairs. | $185,000 |