Back to kitchen remodel contractors
Bonev Construction
- Based in
- South Lake Tahoe
- On San Francisco permits
- May 2003 to May 2017
- Last 24 months
- 0 permits filed
41 permits since 2000: 34 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2013 | Completed final sign-off May 2014 | 1918 15th St | #2: remodel of (e) kitchen nook w/the inclusion of 24 sq ft of additional conditioned space. the remodel includes new (e) double doors & new windows at rear of bldg, new lighting, new water heater, new elec. heat pads & new finishes. project also includes replacing (e) wood wndw at streetDetails
#2: remodel of (e) kitchen nook w/the inclusion of 24 sq ft of additional conditioned space. the remodel includes new (e) double doors & new windows at rear of bldg, new lighting, new water heater, new elec. heat pads & new finishes. project also includes replacing (e) wood wndw at street | $20,000 |
| Jun 24, 2013 | Completed final sign-off Sep 2013 | 1855 Alabama St | #2- kitchen and bathroom remodel, replace cabinets, countertops and fixtures, new tiles and shower, sinks & lights. non structural.Details
#2- kitchen and bathroom remodel, replace cabinets, countertops and fixtures, new tiles and shower, sinks & lights. non structural. | $18,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 726 Hayes St | kitchen remodel, bathroom remodel, one window replaced in the kitchen area, new washer & dryer in utility room.Details
kitchen remodel, bathroom remodel, one window replaced in the kitchen area, new washer & dryer in utility room. | $20,000 |
| Sep 17, 2010 | Completed final sign-off Dec 2010 | 14 Scott Al | new kitchen cabinets & counters, not moving or adding wallsDetails
new kitchen cabinets & counters, not moving or adding walls | $5,000 |
| Aug 8, 2008 | Completed final sign-off Nov 2008 | 90 Sanchez St | kitchen remodel cabinets replace new plumbing and electrical new granit app. sink installation.Details
kitchen remodel cabinets replace new plumbing and electrical new granit app. sink installation. | $10,000 |
| May 1, 2008 | Completed final sign-off Nov 2008 | 392 Marietta Dr | interior renovation of (e) kitchen and family room. remove wall for new opening, add kitchen islandDetails
interior renovation of (e) kitchen and family room. remove wall for new opening, add kitchen island | $7,500 |
| Nov 8, 2007 | Completed final sign-off Nov 2007 | 610 Rockdale Dr | revision to pa# 2007/10/17/5647. 1 window replacement. kitchen complaint# 200728629.Details
revision to pa# 2007/10/17/5647. 1 window replacement. kitchen complaint# 200728629. | $400 |
| Nov 8, 2007 | Completed final sign-off Feb 2008 | 618 Rockdale Dr | kitchen remodel & front stair repair. replace less than 50%.Details
kitchen remodel & front stair repair. replace less than 50%. | $12,000 |
| Oct 17, 2007 | Completed final sign-off Nov 2007 | 610 Rockdale Dr | kitchen remodel. install fluorescent lights only.Details
kitchen remodel. install fluorescent lights only. | $8,170 |
| Aug 13, 2007 | Completed final sign-off Sep 2007 | 642 Rockdale Dr | kitchen remodel, only fluorescent lihgt in kitchenDetails
kitchen remodel, only fluorescent lihgt in kitchen | $8,000 |
| Jun 26, 2006 | Expired or cancelled expired Mar 2007 | 271 Ripley St | different upper level layout per drawints s1,a2.1,a2.2. kitchen at lower level to remain. revision to 200408030453Details
different upper level layout per drawints s1,a2.1,a2.2. kitchen at lower level to remain. revision to 200408030453 | $12,000 |
| Dec 12, 2003 | Completed final sign-off Feb 2004 | 176 Peralta Av | install new kitchen & bathroom, associated elec/plumbing work, new sheetrock,frame as necessary,Details
install new kitchen & bathroom, associated elec/plumbing work, new sheetrock,frame as necessary, | $15,000 |
| Sep 8, 2003 | Completed final sign-off Nov 2003 | 1363 Plymouth Av | kitchen remodeling/replace counter top, cabinets, flooring, sheetrk/ replace 3 wndw in kchnDetails
kitchen remodeling/replace counter top, cabinets, flooring, sheetrk/ replace 3 wndw in kchn | $16,900 |