Back to bathroom remodel contractors
Bonev Construction
- Based in
- South Lake Tahoe
- On San Francisco permits
- May 2003 to May 2017
- Last 24 months
- 0 permits filed
41 permits since 2000: 34 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2014 | Completed final sign-off Feb 2015 | 1733 Noe St | remove plaster sheetrock and insullation and fixtures in the extg bathroom. new bathroom fixtures, shower and tub. add a bathroom.Details
remove plaster sheetrock and insullation and fixtures in the extg bathroom. new bathroom fixtures, shower and tub. add a bathroom. | $1,000 |
| Jun 24, 2013 | Completed final sign-off Sep 2013 | 1855 Alabama St | #2- kitchen and bathroom remodel, replace cabinets, countertops and fixtures, new tiles and shower, sinks & lights. non structural.Details
#2- kitchen and bathroom remodel, replace cabinets, countertops and fixtures, new tiles and shower, sinks & lights. non structural. | $18,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 726 Hayes St | kitchen remodel, bathroom remodel, one window replaced in the kitchen area, new washer & dryer in utility room.Details
kitchen remodel, bathroom remodel, one window replaced in the kitchen area, new washer & dryer in utility room. | $20,000 |
| Mar 19, 2012 | Completed final sign-off Jun 2012 | 90 Sanchez St | two bathrooms remodel, new bldg shower, new toilets, new sinks, new tiles and fixtures. new window replacement. window same size, same locations. no changes on wall and openings.Details
two bathrooms remodel, new bldg shower, new toilets, new sinks, new tiles and fixtures. new window replacement. window same size, same locations. no changes on wall and openings. | $10,000 |
| Sep 3, 2010 | Completed final sign-off Oct 2010 | 14 Scott Al | remodle bathroom: new build in shower, new toilet, new sink, new plumbing & electrical fixtures, new tiles. high efficacy lighting or occupancy sensor controlDetails
remodle bathroom: new build in shower, new toilet, new sink, new plumbing & electrical fixtures, new tiles. high efficacy lighting or occupancy sensor control | $7,000 |
| Jan 16, 2007 | Completed final sign-off Apr 2007 | 51 Van Buren St | 1 bathroom remodel @ 2nd floor.Details
1 bathroom remodel @ 2nd floor. | $5,000 |
| Dec 12, 2003 | Completed final sign-off Feb 2004 | 176 Peralta Av | install new kitchen & bathroom, associated elec/plumbing work, new sheetrock,frame as necessary,Details
install new kitchen & bathroom, associated elec/plumbing work, new sheetrock,frame as necessary, | $15,000 |