Back to kitchen remodel contractors
Blackford Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jan 2011
- Last 24 months
- 0 permits filed
64 permits since 2000: 50 completed, 3 never finaled, 11 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 13 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2011 | Completed final sign-off Apr 2011 | 52 Sonoma St | remove replace 1 kitchen cabinets and appliances light to comply with cec 150 k. no change in walls, windows and doors.Details
remove replace 1 kitchen cabinets and appliances light to comply with cec 150 k. no change in walls, windows and doors. | $10,000 |
| Jan 19, 2011 | Completed final sign-off Apr 2011 | 54 Sonoma St | remove replace 1 kitchen cabinets and appliances light to comply with cec 150 k. no change in walls, windows and doors.Details
remove replace 1 kitchen cabinets and appliances light to comply with cec 150 k. no change in walls, windows and doors. | $10,000 |
| Jul 10, 2009 | Completed final sign-off Sep 2009 | 2301 Harrison St | unit # 102: remove and replace kitchen cabinets with new countertop and backsplash. new electrical - existing plumbing to be used (non-structural/in-kind)Details
unit # 102: remove and replace kitchen cabinets with new countertop and backsplash. new electrical - existing plumbing to be used (non-structural/in-kind) | $14,000 |
| Oct 22, 2008 | Completed final sign-off Feb 2009 | 464 Linden St | remove & replace plaster/sheetrock thru-out unit.new elec thru out.new plumb as req.new bathroom,new kitchen incl cabinets, new flooring. paint, casing & trim. add new insulation to outside walls & ceiling. windows & doors replace in kind as needed.Details
remove & replace plaster/sheetrock thru-out unit.new elec thru out.new plumb as req.new bathroom,new kitchen incl cabinets, new flooring. paint, casing & trim. add new insulation to outside walls & ceiling. windows & doors replace in kind as needed. | $42,000 |
| Jul 31, 2008 | Completed final sign-off Oct 2008 | 1951 Turk St | remodel bath, new wiring, update plumbing, new sheetrock and tile, (new lighting occupant sensor), kitchen lighting least 50% lumens fluorescent, remodel kitchen, new wiring, update plumbing, new cabinets, new sheetrock, shorten 3 windows in lightwell, tile and coutnertops. no structural work.Details
remodel bath, new wiring, update plumbing, new sheetrock and tile, (new lighting occupant sensor), kitchen lighting least 50% lumens fluorescent, remodel kitchen, new wiring, update plumbing, new cabinets, new sheetrock, shorten 3 windows in lightwell, tile and coutnertops. no structural work. | $30,000 |
| Mar 27, 2008 | Completed final sign-off Jun 2008 | 1145 Lake St | work @ unit# 1145 (lower unit) only. install new electrical, plumbing as required. new cabinets in kitchen. install sheetrock. no structural. no new partitions. approx 12 x 15.Details
work @ unit# 1145 (lower unit) only. install new electrical, plumbing as required. new cabinets in kitchen. install sheetrock. no structural. no new partitions. approx 12 x 15. | $46,000 |
| Jun 9, 2004 | Completed final sign-off Oct 2004 | 2819 Laguna St | remodel kitchen & bathroom.removel post & beam, upgrade elect & plumb.Details
remodel kitchen & bathroom.removel post & beam, upgrade elect & plumb. | $48,500 |
| Jun 25, 2003 | Completed final sign-off Dec 2003 | 64 05th Av | new kitchen, new master bath, new guest bath, remove non-bearing wall in living roomDetails
new kitchen, new master bath, new guest bath, remove non-bearing wall in living room | $102,500 |
| Apr 23, 2003 | Completed final sign-off May 2003 | 1613 Baker St | remove & replace cabinets(kitchen)new counter top,electrical & plumbing to code.remove & replaceDetails
remove & replace cabinets(kitchen)new counter top,electrical & plumbing to code.remove & replace | $14,300 |
| Feb 6, 2003 | Expired or cancelled expired Dec 2003 | 1609 Baker St | remove exiting kitchen wall-install glu lam to support 2nd fl & ceiling and sheetrock per plans.Details
remove exiting kitchen wall-install glu lam to support 2nd fl & ceiling and sheetrock per plans. | $12,500 |
| Jul 25, 2002 | Completed final sign-off Dec 2002 | 1388 Gough St | kitchen and bath remodelDetails
kitchen and bath remodel | $42,000 |
| Dec 10, 2001 | Completed final sign-off Mar 2002 | 1611 Baker St | kitchen add lighting.remove/repace cabinets.exterior repair dryrot at front stairs. new sheetrock/neDetails
kitchen add lighting.remove/repace cabinets.exterior repair dryrot at front stairs. new sheetrock/ne | $42,000 |
| Jan 8, 2001 | Expired or cancelled expired Feb 2002 | 3186 Clay St | electrical demo/add 7 new recessed lights. remove.replace kitchen cabinets, new counter top & back sDetails
electrical demo/add 7 new recessed lights. remove.replace kitchen cabinets, new counter top & back s | $9,850 |
| Feb 22, 2000 | Completed final sign-off Apr 2000 | 135 Buena Vista East Av | remove/replace kitchen cabinets,some electrical upgrade,some plbg upgrade at unit #5Details
remove/replace kitchen cabinets,some electrical upgrade,some plbg upgrade at unit #5 | |
| Feb 22, 2000 | Completed final sign-off Apr 2000 | 135 Buena Vista East Av | remove & replace kitchen cabinets electrical upgrade plbg upgrade,repalce fireplace flu at unit #1Details
remove & replace kitchen cabinets electrical upgrade plbg upgrade,repalce fireplace flu at unit #1 |