Blackford Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jan 2011
- Last 24 months
- 0 permits filed
64 permits since 2000: 50 completed, 3 never finaled, 11 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 14 completed. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2010 | Completed final sign-off May 2010 | 601 Van Ness Av | unit #110: remove exisitng fiberglass tub in bathroom & replace with tile shower. change out plumbing jixtures (at shower). no window, no door, no new wall work on this permit.Details
unit #110: remove exisitng fiberglass tub in bathroom & replace with tile shower. change out plumbing jixtures (at shower). no window, no door, no new wall work on this permit. | $4,600 |
| Sep 2, 2009 | Completed final sign-off Oct 2009 | 173 Buena Vista East Av | unit #173 only -remodel bathroom - new electric plumbing, new electrical, new sheetrock & cement board, new tile. no new walls or wall removal.Details
unit #173 only -remodel bathroom - new electric plumbing, new electrical, new sheetrock & cement board, new tile. no new walls or wall removal. | $15,000 |
| Feb 23, 2009 | Completed final sign-off May 2009 | 2514 Green St | remove tile at walls & floor. work in bathroom. remove only plaster & lath at walls. remove plumbing fixtures. install sheetrock and new rough plumbing. install new tile and finish plumbing. no electrical wiring but change out switch to motion control.Details
remove tile at walls & floor. work in bathroom. remove only plaster & lath at walls. remove plumbing fixtures. install sheetrock and new rough plumbing. install new tile and finish plumbing. no electrical wiring but change out switch to motion control. | $12,000 |
| Oct 22, 2008 | Completed final sign-off Feb 2009 | 464 Linden St | remove & replace plaster/sheetrock thru-out unit.new elec thru out.new plumb as req.new bathroom,new kitchen incl cabinets, new flooring. paint, casing & trim. add new insulation to outside walls & ceiling. windows & doors replace in kind as needed.Details
remove & replace plaster/sheetrock thru-out unit.new elec thru out.new plumb as req.new bathroom,new kitchen incl cabinets, new flooring. paint, casing & trim. add new insulation to outside walls & ceiling. windows & doors replace in kind as needed. | $42,000 |
| Jul 31, 2008 | Completed final sign-off Oct 2008 | 1951 Turk St | remodel bath, new wiring, update plumbing, new sheetrock and tile, (new lighting occupant sensor), kitchen lighting least 50% lumens fluorescent, remodel kitchen, new wiring, update plumbing, new cabinets, new sheetrock, shorten 3 windows in lightwell, tile and coutnertops. no structural work.Details
remodel bath, new wiring, update plumbing, new sheetrock and tile, (new lighting occupant sensor), kitchen lighting least 50% lumens fluorescent, remodel kitchen, new wiring, update plumbing, new cabinets, new sheetrock, shorten 3 windows in lightwell, tile and coutnertops. no structural work. | $30,000 |
| Mar 7, 2008 | Completed final sign-off Apr 2008 | 2514 Green St | bathroom remodel. install new sheetrock/wonderboard, new tile, new lectrical, plumbing, fixtures. paint new lighting to be high efficacy or manual on auto off switch. no structural.Details
bathroom remodel. install new sheetrock/wonderboard, new tile, new lectrical, plumbing, fixtures. paint new lighting to be high efficacy or manual on auto off switch. no structural. | $13,000 |
| Oct 5, 2007 | Completed final sign-off Dec 2007 | 120 Moffitt St | bathroom addtion with in existing structure and addition of non bearing walls for bathroom and change use of storage room to bedroom.Details
bathroom addtion with in existing structure and addition of non bearing walls for bathroom and change use of storage room to bedroom. | $15,000 |
| Dec 4, 2006 | Completed final sign-off Jan 2007 | 767 Bryant St | unit #403: remove/replace tile in (2) bathrooms, install 3 recessed lights and track lighting throughout, remove/replace shower/tub fixturesDetails
unit #403: remove/replace tile in (2) bathrooms, install 3 recessed lights and track lighting throughout, remove/replace shower/tub fixtures | $8,000 |
| Apr 3, 2006 | Completed final sign-off Jul 2006 | 1769 Broadway | bathroom remodel. remove replace toilet and vanity. install new tub/shower new tile and paint. new lighting.Details
bathroom remodel. remove replace toilet and vanity. install new tub/shower new tile and paint. new lighting. | $12,600 |
| Jun 9, 2004 | Completed final sign-off Oct 2004 | 2819 Laguna St | remodel kitchen & bathroom.removel post & beam, upgrade elect & plumb.Details
remodel kitchen & bathroom.removel post & beam, upgrade elect & plumb. | $48,500 |
| Mar 16, 2004 | Completed final sign-off Jul 2004 | 143 Buena Vista East Av | remodel bathroom-new tub/shower, new vanity, new tile on walls and floorDetails
remodel bathroom-new tub/shower, new vanity, new tile on walls and floor | $14,650 |
| Jun 25, 2003 | Completed final sign-off Dec 2003 | 64 05th Av | new kitchen, new master bath, new guest bath, remove non-bearing wall in living roomDetails
new kitchen, new master bath, new guest bath, remove non-bearing wall in living room | $102,500 |
| Jul 25, 2002 | Completed final sign-off Dec 2002 | 1388 Gough St | kitchen and bath remodelDetails
kitchen and bath remodel | $42,000 |
| Jan 13, 2000 | Completed final sign-off Apr 2000 | 135 Buena Vista East Av | #3 bathroom sheetrock, plumbingDetails
#3 bathroom sheetrock, plumbing | $8,000 |