Birmingham Builders, Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2026
- Last 24 months
- 3 permits filed
70 permits since 2000: 21 completed, 4 in progress, 33 never finaled, 12 expired or cancelled.
Of the 33 never-finaled permits, 4 are 3 to 5 years old, 8 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
11 stairs permits: 2 completed, 2 in progress, 5 never finaled, 2 expired or cancelled. Typically 21 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1349 Larkin St | minor ti of 2 levels. and a mezzanine. project scope focuses on new entry doors, lobby, break room, and toilets. this includes non-structural demo, non-structural partitions, and new finishes throughout. mep and structural for stairs will be submitted as deferred submittalDetails
minor ti of 2 levels. and a mezzanine. project scope focuses on new entry doors, lobby, break room, and toilets. this includes non-structural demo, non-structural partitions, and new finishes throughout. mep and structural for stairs will be submitted as deferred submittal | $125,000 |
| Mar 20, 2025 | In progress issued May 2025 | 1301 Sansome St | 2nd & 3rd - minor 2nd & 3rd fl interior renovations to existing office space. renovations to include addition of new convenience stair between the 2nd and 3rd fl, connected to mezzanine. demolition includes alteration to (e) mezzanine guardrail for stair openingDetails
2nd & 3rd - minor 2nd & 3rd fl interior renovations to existing office space. renovations to include addition of new convenience stair between the 2nd and 3rd fl, connected to mezzanine. demolition includes alteration to (e) mezzanine guardrail for stair opening | $40,000 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 100 Vallejo St | revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement.Details
revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement. | |
| Dec 7, 2021 | Never finaled issued Dec 2021, no final | 100 Vallejo St | reconfigure basement office layout, new conferance room, modify kitchen areas, storage, and add lactation room. reconfigure 1st floor office layout. provide new accessible stair. provide new accessible entry door on vallejo street. mep deferredDetails
reconfigure basement office layout, new conferance room, modify kitchen areas, storage, and add lactation room. reconfigure 1st floor office layout. provide new accessible stair. provide new accessible entry door on vallejo street. mep deferred | $85,000 |
| Jan 28, 2014 | Expired or cancelled expired Mar 2026 | 729 Sansome St | revision to appl #2013.03.07.1711: in lieu of beams & posts, provide knee bracing at stairs opening. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to appl #2013.03.07.1711: in lieu of beams & posts, provide knee bracing at stairs opening. ** maher: compliance with ordinance no# 155-13 not required ** | $5,000 |
| Mar 7, 2013 | Expired or cancelled expired Mar 2026 | 729 Sansome St | modification of (e) basement involving installation of connecting stair; demo (e) stair at sw corner of bldg; modify (e) floor 1 involving install steel beams; openings with guardrails & interior walls; modify (e) floor 2 & floor 3 involving installation of floor.Details
modification of (e) basement involving installation of connecting stair; demo (e) stair at sw corner of bldg; modify (e) floor 1 involving install steel beams; openings with guardrails & interior walls; modify (e) floor 2 & floor 3 involving installation of floor. | $60,000 |
| Oct 12, 2011 | Never finaled issued Nov 2011, no final | 589 Howard St | reconfiguration of stairs from 1st floor to basement, new ada bathroom & stair vestibule on ground floor.Details
reconfiguration of stairs from 1st floor to basement, new ada bathroom & stair vestibule on ground floor. | $86,850 |
| Apr 13, 2011 | Never finaled issued Apr 2011, no final | 560 Pacific Av | create new opening at ground floor to basement. new stairs 2 from basement to ground floor structural strengthening of basement and ground floor with new beams and footings per plans.Details
create new opening at ground floor to basement. new stairs 2 from basement to ground floor structural strengthening of basement and ground floor with new beams and footings per plans. | $80,000 |
| Apr 11, 2011 | Completed final sign-off Feb 2012 | 560 Pacific Av | new floor opening at ground floor to basement with new stairs. structural upgrade of bldg per plans. new mezzanine at 2nd floor, new stairs to mezzanine. mezzanine to be 2310 sq ft.Details
new floor opening at ground floor to basement with new stairs. structural upgrade of bldg per plans. new mezzanine at 2nd floor, new stairs to mezzanine. mezzanine to be 2310 sq ft. | $78,500 |
| Sep 21, 2009 | Never finaled issued Nov 2009, no final | 215 02nd St | non-structural demolition of (e) storefront @ basement & ground floor. new storefront @ ground level to enclose existing lightwell. modification of (e) staircase to basement.Details
non-structural demolition of (e) storefront @ basement & ground floor. new storefront @ ground level to enclose existing lightwell. modification of (e) staircase to basement. | $18,000 |
| Feb 2, 2005 | Completed final sign-off Mar 2005 | 1522 Howard St | repair back stairs and replace treads and risers as necessary. work to be done in kind. not toDetails
repair back stairs and replace treads and risers as necessary. work to be done in kind. not to | $1,500 |