Bing Wu Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to May 2026
- Last 24 months
- 3 permits filed
58 permits since 2000: 54 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 17, 2024 | Completed final sign-off Oct 2024 | 1346 26th Av | front of building 10 exterior stair treads less than 50% back of building: replace 25x20 exterior sidingDetails
front of building 10 exterior stair treads less than 50% back of building: replace 25x20 exterior siding | $9,800 |
| Mar 21, 2024 | Completed final sign-off Jul 2024 | 722 24th Av | replace stucco for exterior wall 5' width x 15' height ( street facing, to the right of the front building stairs)Details
replace stucco for exterior wall 5' width x 15' height ( street facing, to the right of the front building stairs) | $3,000 |
| Nov 17, 2020 | Completed final sign-off Aug 2021 | 400 43rd Av | to comply with nov201960881: install 2 opening on g/f at stair lobby. approx sizes 4-6 x 6-10. one opening to be infilled with stucco to match (e), 2nd oening infill with 44x44in slider window.Details
to comply with nov201960881: install 2 opening on g/f at stair lobby. approx sizes 4-6 x 6-10. one opening to be infilled with stucco to match (e), 2nd oening infill with 44x44in slider window. | $2,000 |
| Mar 30, 2018 | Completed final sign-off Dec 2018 | 737 Jackson St | install (1) 6-gallon electric water heater, replace electrical outlets, install emergency lights, replace front door in-kind, new sheetrock for the hallway/stairway walls. all work is in residential area.Details
install (1) 6-gallon electric water heater, replace electrical outlets, install emergency lights, replace front door in-kind, new sheetrock for the hallway/stairway walls. all work is in residential area. | $20,000 |
| Jul 13, 2015 | Completed final sign-off Mar 2016 | 2522 Lawton St | 2nd floor: remodel kitchen and bathroom, add new bathroom, add walk-in clsoet. remove (e) exterior stair. 1st floor: replace water heater and furnace.Details
2nd floor: remodel kitchen and bathroom, add new bathroom, add walk-in clsoet. remove (e) exterior stair. 1st floor: replace water heater and furnace. | $30,000 |
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 565 04th St | revision to pa#201308063629 commercial tenant improvement, change internal stairs & restroom layouts. fire sprinkler, mechanical & electrical work under seperate permit.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13Details
revision to pa#201308063629 commercial tenant improvement, change internal stairs & restroom layouts. fire sprinkler, mechanical & electrical work under seperate permit.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13 | $68,000 |
| Dec 6, 2013 | Completed final sign-off Nov 2015 | 1110 South Van Ness Av | add 1 bedroom, 1 bath, office, living room, interior stairs and in fill rear of building on 1st fl, unit 2. remodel e bedroom, kitchen, and bath on 3rd fl per plan, unit 3. add 1 bedroom, office and laundry room,remodel e kitchen and e bedroom, relocate e bath on 2nd fl 1st ,to be spklr'd 13rDetails
add 1 bedroom, 1 bath, office, living room, interior stairs and in fill rear of building on 1st fl, unit 2. remodel e bedroom, kitchen, and bath on 3rd fl per plan, unit 3. add 1 bedroom, office and laundry room,remodel e kitchen and e bedroom, relocate e bath on 2nd fl 1st ,to be spklr'd 13r | $80,000 |
| Oct 16, 2013 | Completed final sign-off Dec 2014 | 462 Ramsell St | repair stucco wall approximateley 6'x10' and repair stairway in frontyardDetails
repair stucco wall approximateley 6'x10' and repair stairway in frontyard | $4,000 |