Back to kitchen remodel contractors
Bing Wu Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to May 2026
- Last 24 months
- 3 permits filed
58 permits since 2000: 54 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 1 in progress, 1 expired or cancelled. Typically 1 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | In progress issued May 2026 | 1000 Franklin St | unit 305: kitchen remodel like for like, no layout change, no wall stud framing demolition. replace washer and dryer like for like same connections and location.Details
unit 305: kitchen remodel like for like, no layout change, no wall stud framing demolition. replace washer and dryer like for like same connections and location. | $10,000 |
| Jan 15, 2021 | Completed final sign-off May 2024 | 201 Mallorca Wy | replace 1 kitchen sink, countertop, 2 cabinets each unitDetails
replace 1 kitchen sink, countertop, 2 cabinets each unit | $30,000 |
| Nov 8, 2018 | Completed final sign-off May 2019 | 1321 14th Av | replace kitchen appliances, cabinets, electricals,plumbing in kind. replace toilet,fan,tub,sink in bathroom in kind. no structural under this permit.Details
replace kitchen appliances, cabinets, electricals,plumbing in kind. replace toilet,fan,tub,sink in bathroom in kind. no structural under this permit. | $20,000 |
| Jun 16, 2016 | Expired or cancelled expired Jul 2026 | 1588 Hayes St | (add unit per ordinances 30-15) add 2 units on 1st fl. each unit w/ (1) kitchen, (1) bedroom & (1) full bathroom. fire alarm and sprinkler under separate permit.Details
(add unit per ordinances 30-15) add 2 units on 1st fl. each unit w/ (1) kitchen, (1) bedroom & (1) full bathroom. fire alarm and sprinkler under separate permit. | $20,000 |
| Mar 15, 2016 | Completed final sign-off Aug 2017 | 2339 41st Av | legalize as built unit on 1st fl w/ (2) bedroom, (1) storage & (1) kitchen per ordinance 43-14.Details
legalize as built unit on 1st fl w/ (2) bedroom, (1) storage & (1) kitchen per ordinance 43-14. | $20,000 |
| Jul 13, 2015 | Completed final sign-off Mar 2016 | 2522 Lawton St | 2nd floor: remodel kitchen and bathroom, add new bathroom, add walk-in clsoet. remove (e) exterior stair. 1st floor: replace water heater and furnace.Details
2nd floor: remodel kitchen and bathroom, add new bathroom, add walk-in clsoet. remove (e) exterior stair. 1st floor: replace water heater and furnace. | $30,000 |
| Apr 29, 2014 | Completed final sign-off Nov 2015 | 1110 South Van Ness Av | revision to app# 201312063562, change bathr & kitchen rlayout under pa# 201312063562, add new laundry roomDetails
revision to app# 201312063562, change bathr & kitchen rlayout under pa# 201312063562, add new laundry room | $20,000 |
| Jan 3, 2014 | Completed final sign-off Apr 2014 | 620 46th Av | remodel one kitchen, one bedroom on 2nd fl. upgrade electrical service.Details
remodel one kitchen, one bedroom on 2nd fl. upgrade electrical service. | $23,000 |
| Dec 6, 2013 | Completed final sign-off Nov 2015 | 1110 South Van Ness Av | add 1 bedroom, 1 bath, office, living room, interior stairs and in fill rear of building on 1st fl, unit 2. remodel e bedroom, kitchen, and bath on 3rd fl per plan, unit 3. add 1 bedroom, office and laundry room,remodel e kitchen and e bedroom, relocate e bath on 2nd fl 1st ,to be spklr'd 13rDetails
add 1 bedroom, 1 bath, office, living room, interior stairs and in fill rear of building on 1st fl, unit 2. remodel e bedroom, kitchen, and bath on 3rd fl per plan, unit 3. add 1 bedroom, office and laundry room,remodel e kitchen and e bedroom, relocate e bath on 2nd fl 1st ,to be spklr'd 13r | $80,000 |
| Dec 13, 2012 | Completed final sign-off Aug 2013 | 184 Country Club Dr | remodel (e) bathroom, kitchen & construct one new bathroom at 2nd floor. legalize (e) family room, bathroom, laundry room & construct one new bathroom & two bedroom. all work at ground floor.Details
remodel (e) bathroom, kitchen & construct one new bathroom at 2nd floor. legalize (e) family room, bathroom, laundry room & construct one new bathroom & two bedroom. all work at ground floor. | $62,000 |
| Nov 9, 2012 | Completed final sign-off Jan 2013 | 162 San Carlos St | remodel 1 kitchen. size 10x11. lighting must comply w/cec 150(k).between 9/12Details
remodel 1 kitchen. size 10x11. lighting must comply w/cec 150(k).between 9/12 | $8,000 |