Back to kitchen remodel contractors
Better Way Constructor Llc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2018 to Aug 2021
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2021 | Never finaled issued Aug 2021, no final | 729 Jones St | unit 214: one kitchen remodel,remove old cabinets replace with new, new countertop, sink & fixtures & appliances, repaint unit, replacing flooring.Details
unit 214: one kitchen remodel,remove old cabinets replace with new, new countertop, sink & fixtures & appliances, repaint unit, replacing flooring. | $20,000 |
| Dec 20, 2018 | Completed final sign-off Feb 2019 | 155 Clayton St | remodel kitchen and bathroom. change lights, add electric heaters, change tub to a shower, paint approx 10'x12' kitchen. approx 5'x8' bathroom.Details
remodel kitchen and bathroom. change lights, add electric heaters, change tub to a shower, paint approx 10'x12' kitchen. approx 5'x8' bathroom. | $36,837 |