Back to kitchen remodel contractors
Better Construction Ltd
- Based in
- Daly City
- On San Francisco permits
- Aug 2000 to May 2018
- Last 24 months
- 0 permits filed
28 permits since 2000: 25 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2018 | Completed final sign-off Dec 2018 | 1270 41st Av | kitchen remodel: change cabinets, new fixtures (plumbing), new electrical. install new sub-panel. size 10'x10'Details
kitchen remodel: change cabinets, new fixtures (plumbing), new electrical. install new sub-panel. size 10'x10' | $10,000 |
| Jun 30, 2016 | Completed final sign-off Oct 2016 | 4150 Fulton St | remodel kitchen, change cabinets, counter top, install recess lights, new appliances. faucet sink.Details
remodel kitchen, change cabinets, counter top, install recess lights, new appliances. faucet sink. | $20,000 |
| Sep 25, 2015 | Completed final sign-off Dec 2016 | 2561 23rd Av | fill-in lightwell. not visible from street. add stairs to below. remodel kitchen, add skylights, reframe roof. remove old interior stairs - make into closets. remodel (e) legal downstairs family bedroom, office & full bath, add 1.2 bath. new conditioned space 78 sf total. add voluntary shear walls &Details
fill-in lightwell. not visible from street. add stairs to below. remodel kitchen, add skylights, reframe roof. remove old interior stairs - make into closets. remodel (e) legal downstairs family bedroom, office & full bath, add 1.2 bath. new conditioned space 78 sf total. add voluntary shear walls & | $31,500 |
| Sep 17, 2013 | Completed final sign-off Nov 2013 | 1450 Portola Dr | kitchen remodel , replace cabinets, appliances, countertop, sink install led lights, upgrade electricalDetails
kitchen remodel , replace cabinets, appliances, countertop, sink install led lights, upgrade electrical | $10,000 |
| Aug 1, 2013 | Completed final sign-off Oct 2013 | 1218 48th Av | kitchen remodel - replace cabinets, counter, upgrade electrical lighting, modify plumbing. install , sink, hood stove. bathroom remodel, replace bath tub, sink, shower stal, all faucets, upgrade electrical. all work to be on upstairsDetails
kitchen remodel - replace cabinets, counter, upgrade electrical lighting, modify plumbing. install , sink, hood stove. bathroom remodel, replace bath tub, sink, shower stal, all faucets, upgrade electrical. all work to be on upstairs | $20,000 |
| Jun 12, 2013 | Completed final sign-off Oct 2013 | 100 Sloat Bl | remodel kitchen, change cabinets, upgrade electrical modify plumbing, new lighting, new range hood connect to (e) duct led lightingDetails
remodel kitchen, change cabinets, upgrade electrical modify plumbing, new lighting, new range hood connect to (e) duct led lighting | $12,000 |
| Sep 28, 2011 | Completed final sign-off Jan 2012 | 1534 Plymouth Av | remodel kitchen, replace cabinets, all fixtures, upgrade electrical. no structural work. remodel bath, replace all fixtures, upgrade electrical. all new lighting must comply with cec 150 k 10, 1/2 cec 150 k 8Details
remodel kitchen, replace cabinets, all fixtures, upgrade electrical. no structural work. remodel bath, replace all fixtures, upgrade electrical. all new lighting must comply with cec 150 k 10, 1/2 cec 150 k 8 | $35,000 |
| Feb 17, 2011 | Completed final sign-off Jun 2011 | 1691 29th Av | remodel kitchen, cover up interior lightwell, install 2 skylightsDetails
remodel kitchen, cover up interior lightwell, install 2 skylights | $30,000 |
| Feb 9, 2011 | Completed final sign-off Feb 2011 | 1201 Pacheco St | stucco dryrot repair at kitchen window area, visable from street on 16th ave side, about 40 sf.Details
stucco dryrot repair at kitchen window area, visable from street on 16th ave side, about 40 sf. | $4,000 |
| Apr 4, 2003 | Completed final sign-off Jun 2003 | 6933 California St | kitchen remodeling upgrade electrical upgrade plumbing install kitchen cabients plumbing fixturs ligDetails
kitchen remodeling upgrade electrical upgrade plumbing install kitchen cabients plumbing fixturs lig | $15,000 |